Construction of Offshore Platforms 海上平台建设
Pub Date : 1982-12-01 DOI: 10.1016/0198-0254(83)90354-0
S. A. Will
{"title":"Construction of Offshore Platforms","authors":"S. A. Will","doi":"10.1016/0198-0254(83)90354-0","DOIUrl":"https://doi.org/10.1016/0198-0254(83)90354-0","url":null,"abstract":"","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"361 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134227151","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Closure of "An optimum Bid Approximation Model" “一个最优投标近似模型”的结束
Pub Date : 1982-12-01 DOI: 10.1061/JCCEAZ.0001072
P. Sugrue
{"title":"Closure of \"An optimum Bid Approximation Model\"","authors":"P. Sugrue","doi":"10.1061/JCCEAZ.0001072","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001072","url":null,"abstract":"","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"108 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130790831","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Resident Engineer: Intermediary Between Owner and Contractor 驻地工程师:业主和承包商之间的中介
Pub Date : 1982-09-01 DOI: 10.1061/JCCEAZ.0001050
Roberts Re
The resident engineer must possess significant talents other than the necessary technical abilities that qualify him for his position. The tactful and diplomatic handling of project interrelationships not only can resolve construction problems but can forestall them as well. Forming successful on-the-job relationships are covered together with a discussion of personnel introductions, meetings, and other techniques for developing project harmony. The resident engineer’s role as an intermediary, promoting the orderly and expedient conduct of the work, is highlighted.
驻地工程师必须具备胜任其职务所必需的技术能力以外的重要才能。巧妙和外交地处理项目之间的相互关系不仅可以解决施工问题,而且可以预防问题的发生。建立成功的工作关系包括人员介绍,会议和其他发展项目和谐的技巧的讨论。驻地工程师作为中介的作用,促进了工作的有序和权宜的进行。
{"title":"The Resident Engineer: Intermediary Between Owner and Contractor","authors":"Roberts Re","doi":"10.1061/JCCEAZ.0001050","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001050","url":null,"abstract":"The resident engineer must possess significant talents other than the necessary technical abilities that qualify him for his position. The tactful and diplomatic handling of project interrelationships not only can resolve construction problems but can forestall them as well. Forming successful on-the-job relationships are covered together with a discussion of personnel introductions, meetings, and other techniques for developing project harmony. The resident engineer’s role as an intermediary, promoting the orderly and expedient conduct of the work, is highlighted.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128794545","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Prevention and Resolution of Construction Claims 施工索赔的预防和解决
Pub Date : 1982-09-01 DOI: 10.1061/JCCEAZ.0001052
R. Wilson
The owner and architect/engineer's roles in the prevention and resolution of construction claims are examined. A carefully written contract is invaluable in the prevention of a claim. Important aspects of construction contracts are presented, including scheduling, submission of shop drawings, payment terms, rates for time and material work and notification of delays and extra work. The owner and architect/engineer must be aware that his or her actions should be avoided whenever possible. Causes of valid construction claims include extra work, project delays and acceleration, lack of management, limited site access and change in work schedule. The importance of record keeping is stressed. Detailed records help to establish facts if a dispute later develops. Records that should be kept include minutes of meetings, correspondence, progress reports, status logs and photographs.
业主和建筑师/工程师在预防和解决施工索赔中的作用进行了审查。一份精心起草的合同在防止索赔方面是无价的。介绍了建筑合同的重要方面,包括日程安排、提交施工图、付款条件、时间和材料工作的费率以及延迟和额外工作的通知。业主和建筑师/工程师必须意识到,他或她的行为应该尽可能避免。有效的建筑索赔的原因包括额外的工作、项目延迟和加速、缺乏管理、有限的工地进入和工作时间表的改变。强调了记录的重要性。详细的记录有助于在日后发生争议时确定事实。应保留的记录包括会议纪要、通信记录、进度报告、状态日志和照片。
{"title":"Prevention and Resolution of Construction Claims","authors":"R. Wilson","doi":"10.1061/JCCEAZ.0001052","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001052","url":null,"abstract":"The owner and architect/engineer's roles in the prevention and resolution of construction claims are examined. A carefully written contract is invaluable in the prevention of a claim. Important aspects of construction contracts are presented, including scheduling, submission of shop drawings, payment terms, rates for time and material work and notification of delays and extra work. The owner and architect/engineer must be aware that his or her actions should be avoided whenever possible. Causes of valid construction claims include extra work, project delays and acceleration, lack of management, limited site access and change in work schedule. The importance of record keeping is stressed. Detailed records help to establish facts if a dispute later develops. Records that should be kept include minutes of meetings, correspondence, progress reports, status logs and photographs.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123893429","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
Construction Risk: Multiattribute Approach 施工风险:多属性方法
Pub Date : 1982-06-01 DOI: 10.1061/JCCEAZ.0001032
C. Ibbs, K. C. Crandall
Numerous mathematical decision models have been formulated in an attempt to analyze construction risk. Most such efforts have failed because of the limited scope of their objective functions. This study presents field interview results substantiating the hypothesis that decision-making is multiattributed in nature, contrary to the implicit assumption of these other efforts. A theory is introduced which facilitates analysis of complex decisions and selection of consistent courses of action. An illustrative decision problem is solved, not only to explain the mechanics of the theory, but to demonstrate that construction risk is a function of competitive economics as well as project-related characteristics.
为了分析工程风险,人们建立了许多数学决策模型。大多数这类努力都失败了,因为它们的目标职能范围有限。本研究提出的实地访谈结果证实了决策本质上是多属性的假设,与这些其他努力的隐含假设相反。介绍了一种理论,它有助于分析复杂的决策和选择一致的行动方案。解决了一个说明性决策问题,不仅解释了理论的机制,而且证明了施工风险是竞争经济学和项目相关特征的函数。
{"title":"Construction Risk: Multiattribute Approach","authors":"C. Ibbs, K. C. Crandall","doi":"10.1061/JCCEAZ.0001032","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001032","url":null,"abstract":"Numerous mathematical decision models have been formulated in an attempt to analyze construction risk. Most such efforts have failed because of the limited scope of their objective functions. This study presents field interview results substantiating the hypothesis that decision-making is multiattributed in nature, contrary to the implicit assumption of these other efforts. A theory is introduced which facilitates analysis of complex decisions and selection of consistent courses of action. An illustrative decision problem is solved, not only to explain the mechanics of the theory, but to demonstrate that construction risk is a function of competitive economics as well as project-related characteristics.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"83 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122478818","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 22
Graphical Method of Optimization: A Short Cut 图形化优化方法:捷径
Pub Date : 1982-06-01 DOI: 10.1061/JCCEAZ.0001034
S. Popovics
Although optimization problems are usually solved by computer, argument is presented that simpler cases can be handled by non-computer methods. A new, graphical method based on triangular systems of coordinates is presented. The triangular system described is usually considered an equilateral triangle. Each of the three sides of the triangle can be used as a coordinate axis for a variable in a suitable scale. Each combination of the three variables has a correspondent point in the triangle. The coordinates of a point inside the triangle represent the magnitude of each of the three variables, and can be read off of the corresponding scales. Two examples illustrate the application of this method. The method is compared with the Simplex method to show advantages and limitations.
虽然优化问题通常是用计算机来解决的,但也有人提出,一些更简单的情况可以用非计算机方法来处理。提出了一种新的基于三角坐标系的图形化方法。所描述的三角形系统通常被认为是一个等边三角形。三角形的三条边中的每一条都可以作为一个坐标轴,以合适的比例表示一个变量。这三个变量的每个组合在三角形中都有一个对应的点。三角形内一个点的坐标代表三个变量的大小,可以从相应的刻度中读取。两个例子说明了该方法的应用。并与单纯形法进行了比较,说明了该方法的优点和局限性。
{"title":"Graphical Method of Optimization: A Short Cut","authors":"S. Popovics","doi":"10.1061/JCCEAZ.0001034","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001034","url":null,"abstract":"Although optimization problems are usually solved by computer, argument is presented that simpler cases can be handled by non-computer methods. A new, graphical method based on triangular systems of coordinates is presented. The triangular system described is usually considered an equilateral triangle. Each of the three sides of the triangle can be used as a coordinate axis for a variable in a suitable scale. Each combination of the three variables has a correspondent point in the triangle. The coordinates of a point inside the triangle represent the magnitude of each of the three variables, and can be read off of the corresponding scales. Two examples illustrate the application of this method. The method is compared with the Simplex method to show advantages and limitations.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121503557","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Construction Industries and Metrication 建造业及公制化
Pub Date : 1982-03-01 DOI: 10.1061/JCCEAZ.0001016
A. Chalabi, Frank E. Vanzler
A national survey of architects, engineers, contractors, material suppliers and manufacturers is conducted to determine what they feel about conversion to the SI system of measurement. The respondents perceptions of the problems in planning and implementation, their estimated costs and schedules for conversion and their comments and solutions are summarized. No strong opposition to metrication was prevalent. Apprehension about conversion is caused by fear of added cost and difficulties in training labor, increased errors and psychological factors. Many felt however that these problems are short term. The designers and design/construct sectors are the most optimistic in their expectations. Smaller companies have no present plans for conversion while some large companies have significant experience in using the SI system. The majority expect conversion by 1990.
一项针对建筑师、工程师、承包商、材料供应商和制造商的全国性调查正在进行,以确定他们对转换为SI测量系统的感受。总结了受访者对计划和实施中的问题的看法,他们的估计成本和转换时间表以及他们的意见和解决方案。对公制化的强烈反对并不普遍。对转换的恐惧是由于担心增加培训劳动的成本和困难、错误增加和心理因素造成的。然而,许多人认为这些问题是短期的。设计师和设计/建造行业的预期最为乐观。较小的公司目前没有转换的计划,而一些大公司在使用SI系统方面有丰富的经验。大多数人预计到1990年将转变。
{"title":"Construction Industries and Metrication","authors":"A. Chalabi, Frank E. Vanzler","doi":"10.1061/JCCEAZ.0001016","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0001016","url":null,"abstract":"A national survey of architects, engineers, contractors, material suppliers and manufacturers is conducted to determine what they feel about conversion to the SI system of measurement. The respondents perceptions of the problems in planning and implementation, their estimated costs and schedules for conversion and their comments and solutions are summarized. No strong opposition to metrication was prevalent. Apprehension about conversion is caused by fear of added cost and difficulties in training labor, increased errors and psychological factors. Many felt however that these problems are short term. The designers and design/construct sectors are the most optimistic in their expectations. Smaller companies have no present plans for conversion while some large companies have significant experience in using the SI system. The majority expect conversion by 1990.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1982-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115206182","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Bellefonte Primary Containment Structure 贝勒方特主安全壳结构
Pub Date : 1981-12-01 DOI: 10.1061/JCCEAZ.0000997
J. Olyniec
Construction of the reactor building primary containment structure at the Bellefonte Nuclear Plant involved several specialized construction techniques. This two unit plant is one of the nine nuclear units at six different sites now under construction by the Tennessee Valley Authority (TVA). The post-Tensioned, cast-in-place interior steel lined containment structure is unique within TVA. Problems during construction were identified at weekly planning meetings, and options were discussed. Close coordination between craft supervisors and on-site engineering personnel drew together “hands-on” experience and technical background. Details of the construction techniques, problems, and solutions are presented.
贝勒丰特核电站反应堆建筑主安全壳结构的建造涉及几种专门的建造技术。田纳西河谷管理局(TVA)目前正在建设6个不同地点的9个核电机组,这两座机组是其中之一。后张,浇筑在地方内部钢内衬安全壳结构是独特的TVA。在每周的计划会议上发现了施工过程中的问题,并讨论了解决方案。工艺监督员和现场工程人员之间的密切协调,汇集了“实践”经验和技术背景。详细介绍了施工技术、问题和解决方案。
{"title":"Bellefonte Primary Containment Structure","authors":"J. Olyniec","doi":"10.1061/JCCEAZ.0000997","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0000997","url":null,"abstract":"Construction of the reactor building primary containment structure at the Bellefonte Nuclear Plant involved several specialized construction techniques. This two unit plant is one of the nine nuclear units at six different sites now under construction by the Tennessee Valley Authority (TVA). The post-Tensioned, cast-in-place interior steel lined containment structure is unique within TVA. Problems during construction were identified at weekly planning meetings, and options were discussed. Close coordination between craft supervisors and on-site engineering personnel drew together “hands-on” experience and technical background. Details of the construction techniques, problems, and solutions are presented.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1981-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125306875","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Union Challenges to Methods Improvement Programs 工会对方法改进计划的挑战
Pub Date : 1980-12-01 DOI: 10.1061/JCCEAZ.0000915
H. Thomas, Mason P. Holland
This paper presents nine case studies that illustrate the type of labor relation problems that should be anticipated by management whenever a formal productivity measurement program using stopwatches, video tape, or time-lapse photography is initiated. Each case was settled via formal grievance procedures. The rulings of the arbitrators establish guidelines regarding the scope and nature of methods improvement programs, acceptable techniques for measuring productivity, use of time standards, civil liberties of the craftsman, disciplinary action, and favorable language in the collective bargaining agreement. It is shown that management has the right to unilaterally undertake time studies and to establish production standards. It is illustrated that the exact wording of the collective bargaining agreement is the key to establishing what measurement techniques are acceptable. Examples of management rights clauses are presented.
本文提出了9个案例研究,说明了劳资关系问题的类型,当使用秒表、录像带或延时摄影启动正式的生产力测量程序时,管理层应该预料到这些问题。每个案件都通过正式的申诉程序得到解决。仲裁人的裁决建立了关于方法改进计划的范围和性质、可接受的测量生产力的技术、时间标准的使用、工匠的公民自由、纪律行动和集体谈判协议中的有利语言的指导方针。这表明,管理层有权单方面进行时间研究和制定生产标准。说明了集体谈判协议的确切措辞是确定可接受的衡量技术的关键。给出了经营权条款的例子。
{"title":"Union Challenges to Methods Improvement Programs","authors":"H. Thomas, Mason P. Holland","doi":"10.1061/JCCEAZ.0000915","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0000915","url":null,"abstract":"This paper presents nine case studies that illustrate the type of labor relation problems that should be anticipated by management whenever a formal productivity measurement program using stopwatches, video tape, or time-lapse photography is initiated. Each case was settled via formal grievance procedures. The rulings of the arbitrators establish guidelines regarding the scope and nature of methods improvement programs, acceptable techniques for measuring productivity, use of time standards, civil liberties of the craftsman, disciplinary action, and favorable language in the collective bargaining agreement. It is shown that management has the right to unilaterally undertake time studies and to establish production standards. It is illustrated that the exact wording of the collective bargaining agreement is the key to establishing what measurement techniques are acceptable. Examples of management rights clauses are presented.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1980-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130668681","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Photographic Record and Time Delays 摄影记录和时间延迟
Pub Date : 1980-09-01 DOI: 10.1061/JCCEAZ.0000901
R. P. Maher
This paper is presented for suggesting the use of photography to gather valid information about time delays on a construction project, which always cause major expense in themselves, and if they are taken to litigation, even greater expense. One very expensive feature of this item is gathering of evidence to prove causes, extent, and result of delays. For gathering evidence which is accurate and true in its form, and which can be accomplished at a faster and more economical rate, the writer suggests photographic record be used. The use of record as an accepted industry practice and as a legally acceptable documentation tool needs to be justified as to cost.
这篇论文是为了建议使用摄影来收集有关建设项目的时间延误的有效信息,这总是会造成重大的损失,如果他们被起诉,甚至更大的损失。这项工作的一个非常昂贵的特点是收集证据来证明延误的原因、程度和结果。为了收集证据的形式既准确又真实,而且能以更快更经济的速度完成,作者建议采用摄影记录的方法。将记录作为可接受的行业实践和法律上可接受的文件工具需要在成本方面证明是合理的。
{"title":"Photographic Record and Time Delays","authors":"R. P. Maher","doi":"10.1061/JCCEAZ.0000901","DOIUrl":"https://doi.org/10.1061/JCCEAZ.0000901","url":null,"abstract":"This paper is presented for suggesting the use of photography to gather valid information about time delays on a construction project, which always cause major expense in themselves, and if they are taken to litigation, even greater expense. One very expensive feature of this item is gathering of evidence to prove causes, extent, and result of delays. For gathering evidence which is accurate and true in its form, and which can be accomplished at a faster and more economical rate, the writer suggests photographic record be used. The use of record as an accepted industry practice and as a legally acceptable documentation tool needs to be justified as to cost.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1980-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132487673","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
期刊
Journal of the Construction Division
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1