Rejuvenating Late Life Field Opportunitiies at the Greater Sirikit Oilfied: Effective Produced Water Management and Facility Upgrades at the Lan Krabue Well Site L Processing Facility

Pacharapol Charoensuk, Supaluck Watanapanich, Nattapong Lertrojanachusit, Saranee Nitayaphan
{"title":"Rejuvenating Late Life Field Opportunitiies at the Greater Sirikit Oilfied: Effective Produced Water Management and Facility Upgrades at the Lan Krabue Well Site L Processing Facility","authors":"Pacharapol Charoensuk, Supaluck Watanapanich, Nattapong Lertrojanachusit, Saranee Nitayaphan","doi":"10.2523/iptc-22900-ms","DOIUrl":null,"url":null,"abstract":"\n The Greater Sirikit Oilfield (GS1) is an onshore asset located in Kamphaeng Phet, Thailand. Waterflooding accounts for over 64% of the crude output in this field. Consequently, the water cut at GS1 continue to escalate rapidly with the current level approaching 70%. To unlock additional processing capacities, the Lan Krabue Well Site L (LKU-L) Processing Facility is being upgraded with primary and secondary water treatment units to adequately manage and dispose the rising produced water volumes.\n The LKU-L Processing Facility upgrades include the following primary/secondary water treatment units:\n Desander & deoiler hydrocylones to remove solid particles and recover free-oil droplets. Dissolved Gas Flotation (DGF) package to reduce suspended solid/oil concentrations in produced water used for waterflooding.\n Throughout the execution, project requirements were continuously refined to value past design and operational pain-points through multiple, collaborative feedback sessions with the end-user operations team. Lessons learned from the successful pilot DGF/DAF units at GS1 were also methodically scrutinized to improve equipment design, process scheme, and operation/control philosophy ensuring the new unit consistently achieve performance specifications.\n The new desander and deoiler hydrocyclones at the LKU-L Processing Facility will condition the produced water stream for secondary treatment by reducing the solid and free-oil concentrations to below 200 mg/L (>95% removal for particles > 20 microns) and 100 ppm,v respectively. The DGF unit will then further decrease the total suspended solids and oil-in-water contents below 20 mg/L (>80% removal for particles > 5 microns) and 25 ppm,v respectively. Improvements in the quality of disposal water used for waterflooding will mitigate injectivity concerns in up to 72 injection wells resulting in a cost-savings of $7.2 million. Moreover, gross production entering the LKU-L facility can also be increased by 18,400 bpd (+134%) which will generate an additional 5,520 bpd of crude (+$98.4 million/year revenue).\n Several technical enhancements were also contrived to tackle existing operational concerns and brownfield modification challenges:\n Revamp existing process design and control schemes to improve the deoiler hydrocyclone performance. Unique partitioning of the desander & deoiler hydrocyclones to allow flexible turndown capacities. Revisit the retention time of the DGF unit to improve solid and oil removal efficiencies. Online weir adjustment functionality in the DGF vessel to facilitate performance optimization. Installation of sand-jetting system in an existing separator without hot work\n The design enhancements for the primary/secondary water treatment units at the upgraded LKU-L Processing Facility are being liberally replicated and implemented at three other similar processing facilities in GS1. Furthermore, the design improvements of the DGF unit can serve as a best-practice guideline for similar units in PTTEP and for other oil and gas operators. Prioritizing operational challenges is also an excellent practice that help cater requirements to actual end-user needs.","PeriodicalId":153269,"journal":{"name":"Day 2 Thu, March 02, 2023","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Thu, March 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22900-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Greater Sirikit Oilfield (GS1) is an onshore asset located in Kamphaeng Phet, Thailand. Waterflooding accounts for over 64% of the crude output in this field. Consequently, the water cut at GS1 continue to escalate rapidly with the current level approaching 70%. To unlock additional processing capacities, the Lan Krabue Well Site L (LKU-L) Processing Facility is being upgraded with primary and secondary water treatment units to adequately manage and dispose the rising produced water volumes. The LKU-L Processing Facility upgrades include the following primary/secondary water treatment units: Desander & deoiler hydrocylones to remove solid particles and recover free-oil droplets. Dissolved Gas Flotation (DGF) package to reduce suspended solid/oil concentrations in produced water used for waterflooding. Throughout the execution, project requirements were continuously refined to value past design and operational pain-points through multiple, collaborative feedback sessions with the end-user operations team. Lessons learned from the successful pilot DGF/DAF units at GS1 were also methodically scrutinized to improve equipment design, process scheme, and operation/control philosophy ensuring the new unit consistently achieve performance specifications. The new desander and deoiler hydrocyclones at the LKU-L Processing Facility will condition the produced water stream for secondary treatment by reducing the solid and free-oil concentrations to below 200 mg/L (>95% removal for particles > 20 microns) and 100 ppm,v respectively. The DGF unit will then further decrease the total suspended solids and oil-in-water contents below 20 mg/L (>80% removal for particles > 5 microns) and 25 ppm,v respectively. Improvements in the quality of disposal water used for waterflooding will mitigate injectivity concerns in up to 72 injection wells resulting in a cost-savings of $7.2 million. Moreover, gross production entering the LKU-L facility can also be increased by 18,400 bpd (+134%) which will generate an additional 5,520 bpd of crude (+$98.4 million/year revenue). Several technical enhancements were also contrived to tackle existing operational concerns and brownfield modification challenges: Revamp existing process design and control schemes to improve the deoiler hydrocyclone performance. Unique partitioning of the desander & deoiler hydrocyclones to allow flexible turndown capacities. Revisit the retention time of the DGF unit to improve solid and oil removal efficiencies. Online weir adjustment functionality in the DGF vessel to facilitate performance optimization. Installation of sand-jetting system in an existing separator without hot work The design enhancements for the primary/secondary water treatment units at the upgraded LKU-L Processing Facility are being liberally replicated and implemented at three other similar processing facilities in GS1. Furthermore, the design improvements of the DGF unit can serve as a best-practice guideline for similar units in PTTEP and for other oil and gas operators. Prioritizing operational challenges is also an excellent practice that help cater requirements to actual end-user needs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
振兴大诗丽吉油田的后期油田机会:Lan Krabue井场L处理设施的有效采出水管理和设施升级
大诗丽吉油田(GS1)是位于泰国Kamphaeng Phet的陆上资产。水驱占该油田原油产量的64%以上。因此,GS1的含水率继续迅速上升,目前的水平接近70%。为了释放额外的处理能力,Lan Krabue井场L (LKU-L)处理设施正在升级,增加一级和二级水处理单元,以充分管理和处理不断增加的采出水量。LKU-L处理设施的升级包括以下一级/二级水处理单元:除砂器和除油器水力旋流器,用于去除固体颗粒并回收游离油滴。溶解气浮选(DGF)包,用于降低水驱采出水中悬浮固体/油的浓度。在整个执行过程中,通过与最终用户运营团队的多次协作反馈会议,不断地细化项目需求,以评估过去的设计和操作痛点。从GS1的成功试点DGF/DAF装置中吸取的经验教训也被有条不紊地仔细审查,以改进设备设计、工艺方案和操作/控制理念,确保新装置始终达到性能规格。LKU-L处理设施的新型除砂器和除油器水力旋流器将通过将固体和游离油浓度分别降至200 mg/L以下(对> 20微米的颗粒去除率>95%)和100 ppm,v来调节采出水流,以进行二次处理。DGF装置将进一步降低总悬浮固体和水包油含量,分别低于20 mg/L(> 5微米颗粒去除率>80%)和25 ppm,v。改善用于水驱的处理水的质量将减轻多达72口注水井的注入性问题,从而节省720万美元的成本。此外,进入LKU-L设施的总产量也可以增加18400桶/天(+134%),这将产生额外的5520桶/天的原油(+ 9840万美元/年的收入)。为了解决现有的操作问题和棕地改造挑战,还进行了一些技术改进:改造现有的工艺设计和控制方案,以提高脱油器水力旋流器的性能。独特的除砂器和除油器水力旋流器分区,允许灵活的调节能力。重新调整DGF装置的停留时间,以提高固体和除油效率。DGF容器中的在线堰调节功能,以促进性能优化。升级后的LKU-L处理设施的一级/二级水处理装置的改进设计,已广泛复制,并在GS1的其他三个类似处理设施中实施。此外,DGF装置的设计改进可以作为PTTEP和其他油气运营商类似装置的最佳实践指南。确定操作挑战的优先级也是一个很好的实践,它有助于满足实际终端用户的需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Advancement of Open Hole Gravel Pack and Zonal Isolation with Selective Intelligent Completion in Deepwater Malaysia Reaching Beyond the Limit, the Furthest Step Out S Shape Wells in Deep Gas Well Project Application and Performance Monitoring of Compound Air Plasma Lightning Rejection System Malaysia's First Use of Subsea Release Plug System for Dual Barrier Offline Cementing (DBOC) Across Hydrocarbon Section Helps Streamline Activities Drilling Weak Formations in Rumaila Field in Southern Iraq — Modelling Shear Failure Using Numerical Models
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1