{"title":"Challenges in Conducting Risk Assessment and Designing Protection Measures as per IEC 62305 for a Twin Tower of Different Heights","authors":"A. Gomes, Chandima Gomes","doi":"10.1109/ICLP56858.2022.9942666","DOIUrl":null,"url":null,"abstract":"This paper addresses some practical issues at the stages of conducting the risk assessment and designing the external lightning protection system according to the IEC 62305 standards, for a twin-tower building. In a building complex of multiple structures, a significant difference in material and installation cost could be resulted depending on the fact that the complex is considered as a single building or several individual buildings. The standards do not specify a solid criterion for determining whether several adjacent buildings are considered as a single entity or multiple structures. The same issue may give rise to a strategically problematic scenario in designing the air-termination system for tall twin structures with different heights as IEC 62305–3 (2010) standards prescribe air-termination network down to 80% of the height of the building from the rooftop level, for buildings of height more than 60 m. The paper proposes a rational solution for overcoming the undetermined specifications pertinent to these cases.","PeriodicalId":403323,"journal":{"name":"2022 36th International Conference on Lightning Protection (ICLP)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 36th International Conference on Lightning Protection (ICLP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICLP56858.2022.9942666","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper addresses some practical issues at the stages of conducting the risk assessment and designing the external lightning protection system according to the IEC 62305 standards, for a twin-tower building. In a building complex of multiple structures, a significant difference in material and installation cost could be resulted depending on the fact that the complex is considered as a single building or several individual buildings. The standards do not specify a solid criterion for determining whether several adjacent buildings are considered as a single entity or multiple structures. The same issue may give rise to a strategically problematic scenario in designing the air-termination system for tall twin structures with different heights as IEC 62305–3 (2010) standards prescribe air-termination network down to 80% of the height of the building from the rooftop level, for buildings of height more than 60 m. The paper proposes a rational solution for overcoming the undetermined specifications pertinent to these cases.