{"title":"Current Situation and Development Trend of Decommissioning of Nuclear Power Plants","authors":"Cao Guochang, Kang Yunding, Li Zhihua","doi":"10.1115/icone29-93254","DOIUrl":null,"url":null,"abstract":"\n The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of nuclear power plants, they have to face the problem of decommissioning. The safe decommissioning of nuclear power plants is the guarantee for the sustainable development of nuclear power. After the termination of the operation of nuclear power plants, in order to ensure the safety of the public and the environment, the plant site should be purified, demolished and cleaned to reach the restricted utilization level or unrestricted opening. This paper studies the operation and decommissioning status of nuclear power plants from both international and domestic levels, and analyzes the real time cycle and development trend of decommissioning projects. The research shows that in the international nuclear power plant decommissioning market, the nuclear power pioneer countries have successively established national laboratories or research centers to carry out research on the decommissioning technology of nuclear power plants, developed a large number of advanced technologies and tooling equipment, and formed their own technical characteristics and technical advantages; the nuclear power plant decommissioning is increasingly researched in China, but the decommissioning practice has not been started yet in this country. The industry and relevant parties should carry out systematic construction for the decommissioning of nuclear power plants from the aspects of capital sources, regulations, standards, technical reserves, organizational structure and talent reserves.","PeriodicalId":249213,"journal":{"name":"Volume 9: Decontamination and Decommissioning, Radiation Protection, and Waste Management","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 9: Decontamination and Decommissioning, Radiation Protection, and Waste Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/icone29-93254","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of nuclear power plants, they have to face the problem of decommissioning. The safe decommissioning of nuclear power plants is the guarantee for the sustainable development of nuclear power. After the termination of the operation of nuclear power plants, in order to ensure the safety of the public and the environment, the plant site should be purified, demolished and cleaned to reach the restricted utilization level or unrestricted opening. This paper studies the operation and decommissioning status of nuclear power plants from both international and domestic levels, and analyzes the real time cycle and development trend of decommissioning projects. The research shows that in the international nuclear power plant decommissioning market, the nuclear power pioneer countries have successively established national laboratories or research centers to carry out research on the decommissioning technology of nuclear power plants, developed a large number of advanced technologies and tooling equipment, and formed their own technical characteristics and technical advantages; the nuclear power plant decommissioning is increasingly researched in China, but the decommissioning practice has not been started yet in this country. The industry and relevant parties should carry out systematic construction for the decommissioning of nuclear power plants from the aspects of capital sources, regulations, standards, technical reserves, organizational structure and talent reserves.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
核电站退役的现状与发展趋势
核电站的整个生命周期包括三个阶段:建设、运行和退役。核电站在运行寿命的最后阶段,不得不面临退役问题。核电站安全退役是核电可持续发展的保障。核电站停止运行后,为保证公众安全和环境安全,应对厂区进行净化、拆除和清理,达到限制利用水平或无限制开放。本文从国际和国内两个层面对核电站的运行和退役现状进行了研究,分析了退役项目的实时周期和发展趋势。研究表明,在国际核电站退役市场上,核电先锋国纷纷建立国家实验室或研究中心,开展核电站退役技术研究,开发了一大批先进技术和工装设备,形成了自己的技术特色和技术优势;中国对核电站退役的研究越来越多,但退役实践尚未开始。行业和有关方面应从资金来源、法规标准、技术储备、组织结构、人才储备等方面对核电站退役进行系统建设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Novel Transmission Reconstruction Algorithm for Radioactive Drum Characterization Comparison of the Powderization Effect of Non-Equilibrium Plasma Oxidation and Thermochemical Oxidation Powders of Uranium Dioxide Solids for Actinide Analysis Study on Performance of New Flexible Shielding Materials and First Demonstration Application in CPR Nuclear Power Plant Study on Time-Dependent Co-58 and Co-60 Activities in the Primary Coolant of CPR1000 PWRs Study on the High Temperature Melting Treatment of Nuclear Waste Glass Fiber
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1