{"title":"Delivery of electricity to cluster-like consumers","authors":"J. Survilo","doi":"10.1109/RTUCON.2014.6998171","DOIUrl":null,"url":null,"abstract":"To decide how to deliver electricity to cluster-like consumer, the cost of two options should be compared. In the first option, transformerless one, the cluster is connected by LV line (stem) to the central MV/LV transformer; if conductance of all conductors is the same, minimum annual cost is secured when current densities in stem and in cluster lines are equal. Cost minimization is made considering the derivative of curtailed costs observing that maximum voltage drop and current densities do not exceed admissible values. In the second option, MV/LV transformer located at the cluster is connected by MV stem to the center and cross-sections of the MV stem line and of the cluster lines are defined in a usual way. Most of the annual cost falls on the cluster transformer.","PeriodicalId":259790,"journal":{"name":"2014 55th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 55th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTUCON.2014.6998171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To decide how to deliver electricity to cluster-like consumer, the cost of two options should be compared. In the first option, transformerless one, the cluster is connected by LV line (stem) to the central MV/LV transformer; if conductance of all conductors is the same, minimum annual cost is secured when current densities in stem and in cluster lines are equal. Cost minimization is made considering the derivative of curtailed costs observing that maximum voltage drop and current densities do not exceed admissible values. In the second option, MV/LV transformer located at the cluster is connected by MV stem to the center and cross-sections of the MV stem line and of the cluster lines are defined in a usual way. Most of the annual cost falls on the cluster transformer.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
向集群式消费者输送电力
为了决定如何向集群型消费者输送电力,应该比较两种方案的成本。在第一种方案(无变压器方案)中,集群通过低压线路(杆)连接到中央中压/低压变压器;如果所有导体的导电性相同,则当阀芯和串芯线路的电流密度相等时,可以保证最低的年成本。考虑到缩减成本的导数,观察到最大电压降和电流密度不超过允许值,从而使成本最小化。在第二种方案中,位于集群的中压/低压变压器通过中压杆连接到中心,中压杆线和集群线的横截面按照通常的方式定义。大部分的年度成本落在集群变压器上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Short-term wind speed forecasting with ARIMA model Combined comparison-regression method for assessment of CVR effects Evaluation of cell balancing solution with a custom energy measurement device design Induction heat treatment device and technique of bioceramic coatings production on titanium implants Evaluation of stability of several LED drivers in smart lighting applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1