{"title":"Construction of Morrison Bridge","authors":"R. Bane","doi":"10.1061/JCCEAZ.0000023","DOIUrl":null,"url":null,"abstract":"Bridge in Portland, Ore, is 760 ft long together with approaches, and carries 6-lane roadway; river crossing has two deck truss approach spans and double-leaf bascule span with 220 ft clear horizontal opening; pile driving for four piers; pier foundations were built one at time to permit maximum reuse of cofferdam materials.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1960-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Bridge in Portland, Ore, is 760 ft long together with approaches, and carries 6-lane roadway; river crossing has two deck truss approach spans and double-leaf bascule span with 220 ft clear horizontal opening; pile driving for four piers; pier foundations were built one at time to permit maximum reuse of cofferdam materials.