{"title":"A batch sizing and scheduling problem on parallel machines with different speeds, maintenance operations, setup times and energy costs","authors":"Margaux Nattaf, C. Artigues, P. Lopez, R. Medina, V. Parada, L. Pradenas","doi":"10.1109/IESM.2015.7380260","DOIUrl":null,"url":null,"abstract":"This paper considers a production scheduling problem in a Chilean company from the metalworking industry. This company produces steel balls of different diameters on parallel production lines. There are different types of production lines and each production line may have a different speed for producing each diameter. Furthermore a setup time occurs when changing the diameter produced on each machine. Besides these production and setup operations, maintenance operations have to be scheduled. These electrical machines yield high energy demands. It is therefore crucial to minimize total energy consumption, which depends on batch/machine assignment, and maximum demand on peak hours. We consider the batch sizing and scheduling problem involving electricity costs in a non-uniform parallel machine context. Given a demand for each family of steel balls, the problem consists in splitting the demand in sublots (batches) that have to be assigned and scheduled on the parallel machines together with the required maintenance operations. The goal is to complete the schedule before a common deadline while minimizing electricity costs. We propose to tackle this problem through mixed integer linear programming. We propose a global formulation and a two-phase matheuristic. Computational results on realistic instances are provided.","PeriodicalId":308675,"journal":{"name":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IESM.2015.7380260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper considers a production scheduling problem in a Chilean company from the metalworking industry. This company produces steel balls of different diameters on parallel production lines. There are different types of production lines and each production line may have a different speed for producing each diameter. Furthermore a setup time occurs when changing the diameter produced on each machine. Besides these production and setup operations, maintenance operations have to be scheduled. These electrical machines yield high energy demands. It is therefore crucial to minimize total energy consumption, which depends on batch/machine assignment, and maximum demand on peak hours. We consider the batch sizing and scheduling problem involving electricity costs in a non-uniform parallel machine context. Given a demand for each family of steel balls, the problem consists in splitting the demand in sublots (batches) that have to be assigned and scheduled on the parallel machines together with the required maintenance operations. The goal is to complete the schedule before a common deadline while minimizing electricity costs. We propose to tackle this problem through mixed integer linear programming. We propose a global formulation and a two-phase matheuristic. Computational results on realistic instances are provided.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有不同速度、维护操作、设置时间和能源成本的并行机器上的批量大小和调度问题
本文研究了智利一家金属加工企业的生产调度问题。这家公司在平行生产线上生产不同直径的钢球。有不同类型的生产线,每条生产线可能有不同的速度来生产不同的直径。此外,当改变每台机器上生产的直径时,会发生设置时间。除了这些生产和安装操作外,还必须安排维护操作。这些电机需要大量的能源。因此,最小化总能耗(取决于批处理/机器分配)和高峰时段的最大需求是至关重要的。研究了非均匀并联环境下涉及电力成本的批量排序问题。给定对每种钢球的需求,问题在于将需求划分为必须在并行机器上分配和安排的子批次(批次)以及所需的维护操作。目标是在共同的截止日期之前完成计划,同时最大限度地减少电力成本。我们建议通过混合整数线性规划来解决这个问题。我们提出了一个全局公式和一个两相数学公式。给出了实际算例的计算结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Cost and benefit analysis of supplier risk mitigation in an aerospace Supply chain Modelling project complexity driven risk paths in new product development Evaluation of control strategies for managing supply chain risks using Bayesian Belief Networks Stability around the hyper-LSP in French distribution channel: a “prey-predator” modeling Relationships between national culture and Lean Management: A literature Review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1