Process Reengineering using Activity Theory and Domain Mapping Matrix Method in Delivering Public Construction Projects

Hadif Alsuwaidi, S. Venkatachalam
{"title":"Process Reengineering using Activity Theory and Domain Mapping Matrix Method in Delivering Public Construction Projects","authors":"Hadif Alsuwaidi, S. Venkatachalam","doi":"10.3311/ccc2019-057","DOIUrl":null,"url":null,"abstract":"The complexity of modern construction projects has been increasing due to the increased number of design disciplines, stakeholders, process and tools. In public project delivery, these complexities are further increased due to the existence of additional bureaucratic procedures. These decade old processes and the bureaucratic procedures left with dysfunctionalities, redundancies and non-value adding process wastes to the project outcome. This in-turn has a significant adverse knock on effect on the public project delivery in time, cost and quality outcomes. Hence, understanding the existing interactions and its complexity among the project delivery elements such as process, people and deliverables in public project delivery are paramount important to modifying the same to obtain the desired outcome based on the dynamic industry needs. In this proposed research, an example public project delivery department’s existing workflow was captured using activity theory. Further, the existence of various people, process, deliverables and their interactions in the project delivery process were identified through an IDEF0 models. The identified project delivery elements and its interactions were then analyzed using a Multi Domain Mapping (MDM) method to evaluate against process dysfunctionalities, redundancies and wastes. In addition, the study also proposed an improved process flow by eliminating the above said discrepancies through a structured business process-reengineering framework. Further, the study validates the proposed framework through expert interview on the modifications made in project delivery elements. The proposed framework will be a guideline/ reference for similar business process reengineering exercise towards a public project delivery process in this region or in a similar context. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The complexity of modern construction projects has been increasing due to the increased number of design disciplines, stakeholders, process and tools. In public project delivery, these complexities are further increased due to the existence of additional bureaucratic procedures. These decade old processes and the bureaucratic procedures left with dysfunctionalities, redundancies and non-value adding process wastes to the project outcome. This in-turn has a significant adverse knock on effect on the public project delivery in time, cost and quality outcomes. Hence, understanding the existing interactions and its complexity among the project delivery elements such as process, people and deliverables in public project delivery are paramount important to modifying the same to obtain the desired outcome based on the dynamic industry needs. In this proposed research, an example public project delivery department’s existing workflow was captured using activity theory. Further, the existence of various people, process, deliverables and their interactions in the project delivery process were identified through an IDEF0 models. The identified project delivery elements and its interactions were then analyzed using a Multi Domain Mapping (MDM) method to evaluate against process dysfunctionalities, redundancies and wastes. In addition, the study also proposed an improved process flow by eliminating the above said discrepancies through a structured business process-reengineering framework. Further, the study validates the proposed framework through expert interview on the modifications made in project delivery elements. The proposed framework will be a guideline/ reference for similar business process reengineering exercise towards a public project delivery process in this region or in a similar context. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于活动理论和领域映射矩阵方法的公共建设项目交付流程再造
由于设计学科、利益相关者、过程和工具的增加,现代建筑项目的复杂性一直在增加。在公共项目交付中,由于存在额外的官僚程序,这些复杂性进一步增加。这些十年的旧过程和官僚程序给项目结果留下了功能失调、冗余和无价值的过程浪费。这反过来又对公共项目交付的时间、成本和质量结果产生了重大的不利影响。因此,理解项目交付要素(如公共项目交付中的过程、人员和可交付物)之间现有的相互作用及其复杂性,对于根据动态行业需求修改它们以获得期望的结果至关重要。在本研究中,利用活动理论捕获了公共项目交付部门现有工作流程的实例。此外,通过IDEF0模型确定了项目交付过程中各种人员、过程、可交付成果及其相互作用的存在。然后使用多域映射(Multi - Domain Mapping, MDM)方法分析确定的项目交付元素及其相互作用,以评估流程功能障碍、冗余和浪费。此外,本研究还提出了一种改进的流程流,通过结构化的业务流程再造框架消除上述差异。此外,该研究通过对项目交付要素修改的专家访谈来验证所提出的框架。建议的框架将成为本地区或类似背景下公共项目交付流程的类似业务流程再造实践的指导/参考。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Input for Hybrid Simulation Modelling Construction Operations What are the Barriers and Drivers Toward BIM Adoption in Nigeria? Ontology Assisted Collaboration Sessions on 4D BIM A Balanced Scorecard for Assessing Automation in Construction Traceability for Built Assets: Proposed Framework for a Digital Record
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1