{"title":"Multi-agent Modeling and Shop-Scheduling of the Manufacturing Enterprise Logistics","authors":"Yong Chen, Feilong Lin, Na Bi","doi":"10.1109/SOLI.2006.329014","DOIUrl":null,"url":null,"abstract":"By researching the enterprise manufacturing logistics system, the model of it is established based on the multi-agent. The model has eight agents including process agent, transition agent, parts agent, etc. The process agent is the most important agent in the model, so the key point is to introduce the mathematical model of process agent based on arithmetic of dynamic scheduling. This agent model can be used to judge whether to accept process tasks according to manufacturing capacity. Taking the example of flexible shop-scheduling about 4 products & 4 machines, it indicates that the modeling method based on multi-agent is useful, efficient","PeriodicalId":325318,"journal":{"name":"2006 IEEE International Conference on Service Operations and Logistics, and Informatics","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Conference on Service Operations and Logistics, and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SOLI.2006.329014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
By researching the enterprise manufacturing logistics system, the model of it is established based on the multi-agent. The model has eight agents including process agent, transition agent, parts agent, etc. The process agent is the most important agent in the model, so the key point is to introduce the mathematical model of process agent based on arithmetic of dynamic scheduling. This agent model can be used to judge whether to accept process tasks according to manufacturing capacity. Taking the example of flexible shop-scheduling about 4 products & 4 machines, it indicates that the modeling method based on multi-agent is useful, efficient