A new efficient priority rule for scheduling job on identical parallel machines

Nabil Sahraoui, H. Hentous
{"title":"A new efficient priority rule for scheduling job on identical parallel machines","authors":"Nabil Sahraoui, H. Hentous","doi":"10.1109/ICMWI.2010.5647922","DOIUrl":null,"url":null,"abstract":"This article aims to study the problem of scheduling on identical parallel machines with different release dates and precedence constraints in tree form to minimize the number of the late jobs; this particular criterion is often used like a performance indicator. This problem is noted by Pm| ri, outtree|∑Ui in standard classification (Graham and Al, 1979). Initially, we present an outline of the work completed by the problems of scheduling to minimize the number of the late jobs. Thereafter we propose two heuristics to solve this problem, the first heuristic based on a new priority rule and the second based on EDD rule.","PeriodicalId":404577,"journal":{"name":"2010 International Conference on Machine and Web Intelligence","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Machine and Web Intelligence","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMWI.2010.5647922","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article aims to study the problem of scheduling on identical parallel machines with different release dates and precedence constraints in tree form to minimize the number of the late jobs; this particular criterion is often used like a performance indicator. This problem is noted by Pm| ri, outtree|∑Ui in standard classification (Graham and Al, 1979). Initially, we present an outline of the work completed by the problems of scheduling to minimize the number of the late jobs. Thereafter we propose two heuristics to solve this problem, the first heuristic based on a new priority rule and the second based on EDD rule.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种新的高效并行机器作业调度优先级规则
本文研究了具有不同放行日期和优先级约束的同一并行机器的树形调度问题,以最小化延迟作业的数量;这个特定的标准通常用作性能指标。标准分类中的Pm| ri, outtree|∑Ui注意到了这个问题(Graham and Al, 1979)。首先,我们提出了一个由调度问题完成的工作大纲,以尽量减少延迟作业的数量。在此基础上,我们提出了两种启发式算法来解决这个问题,第一种是基于新的优先级规则的启发式算法,第二种是基于EDD规则的启发式算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Disparity map estimation with neural network Weighted matrix distance metric for face images classification Exploring semantic roles of Web interface components Clustering approach for false alerts reducing in behavioral based intrusion detection systems Towards re-engineering Web applications into Semantic Web Services
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1