An Effective Means of Tracking Temporary Safety Grounds

G. Drewiske
{"title":"An Effective Means of Tracking Temporary Safety Grounds","authors":"G. Drewiske","doi":"10.1109/esw49146.2022.9925025","DOIUrl":null,"url":null,"abstract":"Recent editions of NFPA 70E require risk assessments to address the potential for human error. This case study will detail how a simple, two-part tagging process to track temporary safety ground sets prevented a tired group of maintenance personnel from energizing into a temporary ground set on the last night of a twelve day utility outage.","PeriodicalId":325388,"journal":{"name":"2022 IEEE IAS Electrical Safety Workshop (ESW)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE IAS Electrical Safety Workshop (ESW)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/esw49146.2022.9925025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Recent editions of NFPA 70E require risk assessments to address the potential for human error. This case study will detail how a simple, two-part tagging process to track temporary safety ground sets prevented a tired group of maintenance personnel from energizing into a temporary ground set on the last night of a twelve day utility outage.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种追踪临时安全场地的有效方法
最新版本的NFPA 70E要求进行风险评估,以解决潜在的人为错误。本案例研究将详细介绍一个简单的两部分标记过程,以跟踪临时安全接地装置,防止一群疲惫的维护人员在12天电力中断的最后一个晚上进入临时接地装置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sensitivity Analysis of Epri Overhead Hv Line Arc Flash Model Analysis of Accidents Caused By Induced Current and Voltage on Transmission Lines and Substations Between 1985–2021 Electrical Shock Sequela Challenge Accepted: Specialty PPE for Shock and Arc Flash Protection The Impact – “Just an Electrician”
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1