{"title":"Construction Innovations at Dworshak Dam","authors":"E. Hershberger","doi":"10.1061/JCCEAZ.0000437","DOIUrl":null,"url":null,"abstract":"Innovations in construction of a large concrete gravity dam include underground crushing chamber, multiple parallel track cableways, long span luffing cableway, conveyor placement of concrete, water reducing admixture, self-raising forms, precast galleries, sloping stationary and slip forms, testing of horizontal construction joint treatment and concrete placement methods, two-way flow control for concrete after-cooling and repair of diversion channel while passing full river flow. Short descriptions are given as an aid in solving future construction problems.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"224 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1974-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000437","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Innovations in construction of a large concrete gravity dam include underground crushing chamber, multiple parallel track cableways, long span luffing cableway, conveyor placement of concrete, water reducing admixture, self-raising forms, precast galleries, sloping stationary and slip forms, testing of horizontal construction joint treatment and concrete placement methods, two-way flow control for concrete after-cooling and repair of diversion channel while passing full river flow. Short descriptions are given as an aid in solving future construction problems.