Over-night Renewals of the Concrete Runway at Sabiha Gökcen International Airport Istanbul

M. Bäuml, Jakob Melchior, Felicia Constandopoulos
{"title":"Over-night Renewals of the Concrete Runway at Sabiha Gökcen International Airport Istanbul","authors":"M. Bäuml, Jakob Melchior, Felicia Constandopoulos","doi":"10.33593/nj0oxhb0","DOIUrl":null,"url":null,"abstract":"Over the last couple of years, new rapid-hardening concretes were developed. They do not only stand out by their high early strength, in excess of 20 MPa already 90 minutes after setting, but are also adjustable to the needs of the construction site in regards to fresh concrete properties and setting behavior. This allows the rapid-hardening concrete to be placed using traditional means and the construction program to be optimized in order to perform the renewals during very short closure windows. After many years of usage, the single runway at Sabiha Gökcen International Airport Istanbul was in need of large-scale renewals due to severe damages in the high wear areas around the centerline. But, with it being the only runway at the airport, closing it for multiple weeks to perform the renewal was not an option. The nightly closure of only 5 hours, due to late-evening and early-morning flights, placed additional demands on the rapid-hardening concrete, the logistics of the construction site and the concrete's long-term durability for a permanent solution. This article presents the step-by-step over-night renewals at Sabiha Gökcen Airport, which is the largest project ever performed involving rapid-hardening concrete. Each night up to 5 slabs (94 m2) of the runway were replaced for a total area of 8700 m2 over 117 nights between March and September 2018. Such large area applications without affecting regular airport operations are possible thanks to the latest generation of rapid-hardening cement and this article shows these possibilities to project owners, design engineers, and contractors.","PeriodicalId":265129,"journal":{"name":"Proceedings of the 12th International Conference on Concrete Pavements","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 12th International Conference on Concrete Pavements","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33593/nj0oxhb0","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Over the last couple of years, new rapid-hardening concretes were developed. They do not only stand out by their high early strength, in excess of 20 MPa already 90 minutes after setting, but are also adjustable to the needs of the construction site in regards to fresh concrete properties and setting behavior. This allows the rapid-hardening concrete to be placed using traditional means and the construction program to be optimized in order to perform the renewals during very short closure windows. After many years of usage, the single runway at Sabiha Gökcen International Airport Istanbul was in need of large-scale renewals due to severe damages in the high wear areas around the centerline. But, with it being the only runway at the airport, closing it for multiple weeks to perform the renewal was not an option. The nightly closure of only 5 hours, due to late-evening and early-morning flights, placed additional demands on the rapid-hardening concrete, the logistics of the construction site and the concrete's long-term durability for a permanent solution. This article presents the step-by-step over-night renewals at Sabiha Gökcen Airport, which is the largest project ever performed involving rapid-hardening concrete. Each night up to 5 slabs (94 m2) of the runway were replaced for a total area of 8700 m2 over 117 nights between March and September 2018. Such large area applications without affecting regular airport operations are possible thanks to the latest generation of rapid-hardening cement and this article shows these possibilities to project owners, design engineers, and contractors.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
伊斯坦布尔萨比哈Gökcen国际机场混凝土跑道的夜间更新
在过去的几年里,新的快速硬化混凝土被开发出来。它们不仅以其高的早期强度脱颖而出,在凝结后90分钟就超过20mpa,而且在新混凝土性能和凝结性能方面也可以根据施工现场的需要进行调整。这允许使用传统方法放置快速硬化混凝土,并优化施工程序,以便在非常短的关闭窗口期间进行更新。经过多年的使用,伊斯坦布尔萨比哈Gökcen国际机场的单跑道需要大规模的更新,因为中心线周围的高磨损区域严重损坏。但是,由于它是机场唯一的跑道,关闭几个星期来进行更新是不可能的。由于深夜和清晨的航班,每晚只关闭5个小时,这对快速硬化的混凝土、施工现场的物流和混凝土的长期耐久性提出了额外的要求。本文介绍了Sabiha Gökcen机场的逐步夜间更新,这是有史以来最大的涉及快速硬化混凝土的项目。在2018年3月至9月期间的117个晚上,每天晚上最多更换5块跑道(94平方米),总面积为8700平方米。由于最新一代的快速硬化水泥,这种不影响常规机场运营的大面积应用成为可能,本文向项目业主、设计工程师和承包商展示了这些可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sensitivity Analysis of FAARFIELD Rigid Airport Pavement Thickness Determination Guidance for Increasing the Use of Recycled Concrete Pavement Materials Performance Summary Of Precast Concrete Inlay Panel Trial In Ontario Validation Of A New Method For Determining The Remaining Service Life Of Rigid Pavements Impacts Of Flooding On Concrete Pavement
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1