Analysis of Activity Planning In the 2765 Dwt Tanker Repair Process Using the Critical Path Method (Cpm)

Ach Alfan Shahri
{"title":"Analysis of Activity Planning In the 2765 Dwt Tanker Repair Process Using the Critical Path Method (Cpm)","authors":"Ach Alfan Shahri","doi":"10.30587/ivrj.v2i1.5080","DOIUrl":null,"url":null,"abstract":"Ships are basically a means of sea transportation, which connects an island or between regions of a country, which is used as passenger transportation, as well as transportation of goods. As the largest archipelagic country in the world, Indonesia has waters with two vast seas which are larger than the land. Therefore, sea transportation has an important role for the sustainability of the economy in Indonesia, so the need for developers in the maritime sector needs to be increased, one of which is in the field of Shipyards. In the ongoing docking process, it is necessary to schedule the work. So that the project runs in a structured manner, it is necessary to pay attention, because scheduling a project itself helps to detail the activities of an activity, the time required for project completion so that the project is on time Completion and there are no delays in workmanship Critical path method (CPM) itself is a method for identifying completion in a project to complete the completion of a project so that it is on time. And the authors use this method to help resolve and compare between the 2765 dwt tanker scheduling made by the shipyard and using the critical path method (CPM). The results of my research entitled \" analysis of activity planning in the 2765 dwt tanker repair process using the critical path method (cpm) \" are. The schedule made by the shipyard gets a completion time of 61 days, whereas if you use the critical path method, it takes 48 days.","PeriodicalId":186363,"journal":{"name":"Indonesian Vocational Research Journal","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Vocational Research Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30587/ivrj.v2i1.5080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Ships are basically a means of sea transportation, which connects an island or between regions of a country, which is used as passenger transportation, as well as transportation of goods. As the largest archipelagic country in the world, Indonesia has waters with two vast seas which are larger than the land. Therefore, sea transportation has an important role for the sustainability of the economy in Indonesia, so the need for developers in the maritime sector needs to be increased, one of which is in the field of Shipyards. In the ongoing docking process, it is necessary to schedule the work. So that the project runs in a structured manner, it is necessary to pay attention, because scheduling a project itself helps to detail the activities of an activity, the time required for project completion so that the project is on time Completion and there are no delays in workmanship Critical path method (CPM) itself is a method for identifying completion in a project to complete the completion of a project so that it is on time. And the authors use this method to help resolve and compare between the 2765 dwt tanker scheduling made by the shipyard and using the critical path method (CPM). The results of my research entitled " analysis of activity planning in the 2765 dwt tanker repair process using the critical path method (cpm) " are. The schedule made by the shipyard gets a completion time of 61 days, whereas if you use the critical path method, it takes 48 days.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
关键路径法分析2765 Dwt油轮维修过程中的作业计划
船舶基本上是一种海上运输工具,它连接一个岛屿或一个国家的地区之间,用作客运,也用于运输货物。作为世界上最大的群岛国家,印度尼西亚有两个比陆地还大的广阔海域。因此,海上运输对印度尼西亚经济的可持续性具有重要作用,因此需要增加对海事部门开发商的需求,其中之一是在造船厂领域。在正在进行的对接过程中,需要对工作进行调度。使项目以结构化的方式运行,是有必要注意的,因为计划一个项目本身有助于详细说明一个活动的活动,项目完成所需的时间,使项目按时完成,没有工艺延误。关键路径法(CPM)本身是一种确定项目完成情况的方法,以完成一个项目,使其按时完成。并利用该方法对船厂制定的2765 dwt油轮调度方案与采用关键路径法(CPM)进行了求解和比较。我的研究结果题为“使用关键路径方法(cpm)分析2765 dwt油轮维修过程中的活动计划”。”。船厂制定的时间表完成时间为61天,而如果使用关键路径方法,则需要48天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Influence of Service Quality, Price, and Convenience on Purchase Decisions of Gofood Services (Study on University of Muhammadiyah Gresik Students) The Effect of Work Motivation, Compensation, and Work Discipline on Employee Performance at PT Darma Panca Samudera Application of Lean Manufacturing to Minimize Waste in the Lajiem Coffee Business Production Process Design of Water PH Quality Monitoring System in PT SIER Industrial Area Based on Internet of Things at Waste Water Treatment Plant Implementation of PLC Outseal as a Controller of Ammonia Gas Circulation in Chicken Coops with HMI Modbus Monitoring
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1