Studi Pengaruh Temperature dan Pembuatan Beton Massa dengan Ketebalan 4 Meter (Studi Kasus : Proyek Gunawangsa Tidar Apartement Surabaya)

Fitria Wardhani, K. Koespiadi
{"title":"Studi Pengaruh Temperature dan Pembuatan Beton Massa dengan Ketebalan 4 Meter (Studi Kasus : Proyek Gunawangsa Tidar Apartement Surabaya)","authors":"Fitria Wardhani, K. Koespiadi","doi":"10.25139/jprs.v2i2.1867","DOIUrl":null,"url":null,"abstract":"Building a building with a large and large number of foundations requires a mass casting method. In mass casting work requires observation and analysis of temperature in order to find out the peak temperature and no thermal cracks occur. In this Final Project aims to determine the effect of mass concrete temperature on the raft foundation of the Surabaya Gunawangsa Tidar Aparment Project. The project has 25 types of raft foundations, but the ones with large dimensions and mass casting are pile cap 114 and pile cap 119. Mass casting is carried out in a full day so after casting it is necessary to observe the effect of concrete temperature. The effect of temperature observed was peak temperature, temperature difference, and statistical hypothesis testing. In general, the peak temperature at ijinkam is 78.20˚ C with a difference in temperature of 20˚C. Observations on pile cap 114 and pile cap 119 are safe and have no thermal cracks.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25139/jprs.v2i2.1867","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Building a building with a large and large number of foundations requires a mass casting method. In mass casting work requires observation and analysis of temperature in order to find out the peak temperature and no thermal cracks occur. In this Final Project aims to determine the effect of mass concrete temperature on the raft foundation of the Surabaya Gunawangsa Tidar Aparment Project. The project has 25 types of raft foundations, but the ones with large dimensions and mass casting are pile cap 114 and pile cap 119. Mass casting is carried out in a full day so after casting it is necessary to observe the effect of concrete temperature. The effect of temperature observed was peak temperature, temperature difference, and statistical hypothesis testing. In general, the peak temperature at ijinkam is 78.20˚ C with a difference in temperature of 20˚C. Observations on pile cap 114 and pile cap 119 are safe and have no thermal cracks.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
温度和4米厚度的质量混凝土塑造影响研究(案例研究:
建造有大量地基的建筑物,需要采用大量浇筑的方法。在大规模铸造工作中需要对温度进行观察和分析,以便找出峰值温度和不发生热裂纹的情况。在这个Final Project中,旨在确定大体积混凝土温度对泗水Gunawangsa Tidar公寓项目木筏基础的影响。本工程有25种筏形基础,但尺寸大、浇筑量大的是114号桩承台和119号桩承台。大体积浇筑是全天进行的,浇筑后有必要观察混凝土温度的影响。观察到的温度影响为峰值温度、温差和统计假设检验。总体而言,伊金坎峰温度为78.20℃,温差为20℃。114号桩帽和119号桩帽观测安全,无热裂缝。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Pemanfaatan Limbah Kulit Kerang Bambu Sebagai Pengganti Sebagian Semen Terhadap Kuat Tekan Beton dengan Penggunaan Agregat Kasar Madura Studi Perbandingan Kadar Ni dan Fe Berdasarkan Sampel Cek Pit dan Sampel Cek Stock Pile Mining Nikel pada PT. Bintangdelapan Mineral Sulawesi Tengah Studi Perancangan Ruang Henti Khusus (RHK) Sepeda Motor Di Simpang Bersinyal (Studi Kasus Simpang Tugu Pecel, Simpang Ruang Terbuka Hijau (RTH) Kartini Dan Simpang Diponegoro Di Kota Madiun) Kajian Desain Struktur Beton Bertulang Dengan Struktur Baja (Studi Kasus Pada Pembangunan Gedung H Unitomo) Kajian Pengetahuan Dan Sikap Pekerja Terhadap Keselamatan Dan Kesehatan Kerja (Studi Kasus Pada Proyek Avian Tower Surabaya)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1