FACTS devices allocation for congestion management considering voltage stability by means of MOPSO

R. S. Wibowo, N. Yorino, M. Eghbal, Y. Zoka, Y. Sasaki
{"title":"FACTS devices allocation for congestion management considering voltage stability by means of MOPSO","authors":"R. S. Wibowo, N. Yorino, M. Eghbal, Y. Zoka, Y. Sasaki","doi":"10.1109/TD-ASIA.2009.5357015","DOIUrl":null,"url":null,"abstract":"This paper proposes a method for solving congestion management problem by optimally allocating FACTS devices. The problem is approached by utilizing optimization method which optimizes generation and installation costs while satisfying voltage stability index. The main contribution of this paper is to provide pareto optimal solutions which describe previous objectives during congestion and after congestion removed. Moreover, the method is able to rank optimal location in relieving congestion, to describe feasibility of solutions and to show better solution in improving voltage stability. Therefore, it is valuable for decision maker in determining locations and sizes of devices which gaining the benefit. Due to the complexity of the problem, Multi Objective Particle Swarm Optimization (MOPSO) is utilized to optimize devices allocation as master sub-problem; Sequential Quadratic Programming (SQP) is used to solve the operation sub-problem, and Point of Collapse method is applied to calculate load margin during contingency. The effectiveness of this technique is demonstrated in modified IEEE 14 bus system.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"130 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5357015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

This paper proposes a method for solving congestion management problem by optimally allocating FACTS devices. The problem is approached by utilizing optimization method which optimizes generation and installation costs while satisfying voltage stability index. The main contribution of this paper is to provide pareto optimal solutions which describe previous objectives during congestion and after congestion removed. Moreover, the method is able to rank optimal location in relieving congestion, to describe feasibility of solutions and to show better solution in improving voltage stability. Therefore, it is valuable for decision maker in determining locations and sizes of devices which gaining the benefit. Due to the complexity of the problem, Multi Objective Particle Swarm Optimization (MOPSO) is utilized to optimize devices allocation as master sub-problem; Sequential Quadratic Programming (SQP) is used to solve the operation sub-problem, and Point of Collapse method is applied to calculate load margin during contingency. The effectiveness of this technique is demonstrated in modified IEEE 14 bus system.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
考虑电压稳定性的MOPSO方法在拥塞管理中的FACTS设备分配
本文提出了一种通过优化分配FACTS设备来解决拥塞管理问题的方法。在满足电压稳定指标的前提下,采用发电和安装成本最优的优化方法来解决该问题。本文的主要贡献是提供了描述拥堵期间和拥堵消除后的先前目标的帕累托最优解。此外,该方法能够对缓解拥塞的最优位置进行排序,描述解决方案的可行性,并在提高电压稳定性方面显示出更好的解决方案。因此,决策者在确定设备的位置和尺寸以获得利益时是有价值的。考虑到问题的复杂性,采用多目标粒子群算法(MOPSO)作为主子问题来优化设备分配;采用序贯二次规划(SQP)求解运行子问题,采用崩溃点法计算突发情况下的负荷余量。在改进的ieee14总线系统中验证了该技术的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1