{"title":"Evaluation Of Vehicle Loading Procedures At KMP.Gambolo and Kmp. Ambu-Ambu in Teluk Bungus Port, West Sumatera Province","authors":"R. Sugiharto, Noor Sulistiyono, Budi Kusuma","doi":"10.54249/iwj.v3i1.45","DOIUrl":null,"url":null,"abstract":"Bungus Bay Crossing Port is one of the ferry ports in West Sumatra Province, has a very strategic position and to support the regional economy.but there are still many finding procedures for loading that are not in accordance with PM 115/2016. The method used in this research is Gap Analysis as a comparison between the existing condition and the expected conditions and focuses on the current gap with the targeted conditions","PeriodicalId":252040,"journal":{"name":"IWJ : Inland Waterways Journal","volume":"207 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IWJ : Inland Waterways Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54249/iwj.v3i1.45","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Bungus Bay Crossing Port is one of the ferry ports in West Sumatra Province, has a very strategic position and to support the regional economy.but there are still many finding procedures for loading that are not in accordance with PM 115/2016. The method used in this research is Gap Analysis as a comparison between the existing condition and the expected conditions and focuses on the current gap with the targeted conditions