Integration of DG in MV-grids: Challenges encountered by the grid operator

E. Coster, D. van Houwelingen
{"title":"Integration of DG in MV-grids: Challenges encountered by the grid operator","authors":"E. Coster, D. van Houwelingen","doi":"10.1049/CP.2009.0510","DOIUrl":null,"url":null,"abstract":"Due to economical and political trends, in the Netherlands the electricity produced by distributed generation units has increased significantly. From 2004 on in the Stedin area, three large greenhouse areas have been developed. In each greenhouse a CHP-plant is installed and as a DSO Stedin saw the number of new CHP-plant connections in its MV grid increasing. Legal rules oblige Stedin to connect CHP-plants in a much shorter time frame than normal project times for necessary grid extensions. This leads to a major grid planning problem, especially when a grid extension of the transmission grid is involved.","PeriodicalId":338532,"journal":{"name":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","volume":"37 31","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/CP.2009.0510","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Due to economical and political trends, in the Netherlands the electricity produced by distributed generation units has increased significantly. From 2004 on in the Stedin area, three large greenhouse areas have been developed. In each greenhouse a CHP-plant is installed and as a DSO Stedin saw the number of new CHP-plant connections in its MV grid increasing. Legal rules oblige Stedin to connect CHP-plants in a much shorter time frame than normal project times for necessary grid extensions. This leads to a major grid planning problem, especially when a grid extension of the transmission grid is involved.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
光伏电网中DG的整合:电网运营商面临的挑战
由于经济和政治趋势,在荷兰,分布式发电机组产生的电力显著增加。从2004年开始,在Stedin地区,已经开发了三个大型温室区。在每个温室中都安装了一个热电联产工厂,作为DSO, Stedin看到中压电网中新的热电联产工厂的数量在增加。法律规定迫使Stedin在比正常项目所需的电网扩展时间短得多的时间内连接热电联产电厂。这导致了一个主要的电网规划问题,特别是当涉及输电网的电网扩展时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dynamic line rating protection for wind farm connections Integration of DG in MV-grids: Challenges encountered by the grid operator
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1