UNDERGROUND MINE DESIGN AND PLANNING: COMPLEXITY AND INTERDEPENDENCIES

M. Morin
{"title":"UNDERGROUND MINE DESIGN AND PLANNING: COMPLEXITY AND INTERDEPENDENCIES","authors":"M. Morin","doi":"10.1142/S0950609802000914","DOIUrl":null,"url":null,"abstract":"Mine design and planning is a very complex, iterative process comprising several interrelated and interdependent factors and considerations. This paper examines visually some of the more important factors and considerations and how they can have a far-reaching influence on the mine design and planning process. Knowing these factors can lead to better decision-making by ensuring that all critical elements are considered. This can be especially important when transforming design and planning knowledge and experience into expert systems to aid mine designers and planners.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mineral Resources Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/S0950609802000914","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Mine design and planning is a very complex, iterative process comprising several interrelated and interdependent factors and considerations. This paper examines visually some of the more important factors and considerations and how they can have a far-reaching influence on the mine design and planning process. Knowing these factors can lead to better decision-making by ensuring that all critical elements are considered. This can be especially important when transforming design and planning knowledge and experience into expert systems to aid mine designers and planners.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
地下矿山设计与规划:复杂性与相互依赖性
矿山设计和规划是一个非常复杂的反复过程,包括若干相互关联和相互依存的因素和考虑。本文直观地考察了一些更重要的因素和考虑因素,以及它们如何对矿山设计和规划过程产生深远的影响。了解这些因素可以确保考虑到所有关键因素,从而做出更好的决策。在将设计和规划知识和经验转化为专家系统以帮助矿山设计人员和规划人员时,这一点尤其重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
SWOTS ANALYSIS OF GLOBAL MINING ENGINEERING EDUCATION A REVISED FORM OF THE BERGMARK-ROOS EQUATION FOR DESCRIBING THE GRAVITY FLOW OF BROKEN ROCK A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV MINING PRACTICE ASSESSING GLOBAL LAND REQUIREMENT FOR SURFACE COPPER MINING Modelling Failure Pattern of a Mining Truck with a Decision Tree Algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1