{"title":"A Study on Life Cycle Cost on Railway Switches and Crossings","authors":"Furkat Lapasov, Kyuhyoung Choi, Jongwoo Lee","doi":"10.1109/ICISCT47635.2019.9011975","DOIUrl":null,"url":null,"abstract":"Switches and crossings (S&Cs) are one of the vital subsystems in railway. The main function of an S&C is to help trains to safely move from one track to another track. To do this, an S&C consists of movable and fixed mechanical parts, as well as signaling and electrical systems. Each of these systems requires a proper maintenance and is susceptible to failures which ultimately lead to train disturbances. The aim of the paper is to carry out life cycle cost analysis for railway S&C which operate over more 40 years. We decompose the life cycle of the S&C and break down them into subsystems to identify which of them requires maintenance. We demonstrated how to decide optimal S&C through cost identification and system breakdown.","PeriodicalId":170576,"journal":{"name":"2019 International Conference on Information Science and Communications Technologies (ICISCT)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Information Science and Communications Technologies (ICISCT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICISCT47635.2019.9011975","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Switches and crossings (S&Cs) are one of the vital subsystems in railway. The main function of an S&C is to help trains to safely move from one track to another track. To do this, an S&C consists of movable and fixed mechanical parts, as well as signaling and electrical systems. Each of these systems requires a proper maintenance and is susceptible to failures which ultimately lead to train disturbances. The aim of the paper is to carry out life cycle cost analysis for railway S&C which operate over more 40 years. We decompose the life cycle of the S&C and break down them into subsystems to identify which of them requires maintenance. We demonstrated how to decide optimal S&C through cost identification and system breakdown.