Optimum VAr support procurement for maintenance of contracted transactions

J. Zhong, E. Bhattacharya
{"title":"Optimum VAr support procurement for maintenance of contracted transactions","authors":"J. Zhong, E. Bhattacharya","doi":"10.1109/DRPT.2000.855740","DOIUrl":null,"url":null,"abstract":"This paper models and addresses the various issues associated with reactive power procurement by an independent system operator functioning in a deregulated electricity market dominated by bilateral contracts. The reactive capability of a generator is modeled within an optimal power flow (OPF) framework. The optimum procurement of reactive power is obtained considering minimization of network losses and deviation from contracted transactions. The CIGRE 32 node network which approximately represents the Swedish system is used for the studies.","PeriodicalId":127287,"journal":{"name":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","volume":"22 6S 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2000.855740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

This paper models and addresses the various issues associated with reactive power procurement by an independent system operator functioning in a deregulated electricity market dominated by bilateral contracts. The reactive capability of a generator is modeled within an optimal power flow (OPF) framework. The optimum procurement of reactive power is obtained considering minimization of network losses and deviation from contracted transactions. The CIGRE 32 node network which approximately represents the Swedish system is used for the studies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
最佳VAr支持采购以维护合同交易
本文模拟并解决了在双边合同主导的解除管制的电力市场中,独立系统运营商与无功电力采购相关的各种问题。在最优潮流(OPF)框架下对发电机的无功能力进行了建模。在考虑网络损耗最小和偏离合同交易的情况下,获得最优无功采购。研究中使用了近似代表瑞典系统的CIGRE 32节点网络。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Degeneracy and duality gap on optimization-based electricity auctions Evaluation of the Romanian electricity industry restructuring process in comparison with the experience in the United Kingdom The use of tangent vectors for voltage collapse analysis Study of interrelations between electric power systems and large consumers in Russia Short-term investment scheduling in transmission power systems by evolutionary computation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1