Implementation of Risk Management in Apartments Development Projects

Akromul Khaidar, F. Rahmawati, M. Aziza, Sidik Ismanu
{"title":"Implementation of Risk Management in Apartments Development Projects","authors":"Akromul Khaidar, F. Rahmawati, M. Aziza, Sidik Ismanu","doi":"10.2991/aebmr.k.210717.034","DOIUrl":null,"url":null,"abstract":"Risk is difficult to predict in construction projects, so it requires a risk analysis. The first risk analysis carried out is the identification of risks to the project. This research uses qualitative methods and risk assessment and to makes a risk register. The results showed that the company carried out mitigation at certain stages, especially at extreme risk and high risk, which needed special attention because this risk would significantly impact project implementation. After mitigation, projects that have a high level of risk and inherent probability have decreased. Keywords—risk management, risk register, construction risk","PeriodicalId":433214,"journal":{"name":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/aebmr.k.210717.034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Risk is difficult to predict in construction projects, so it requires a risk analysis. The first risk analysis carried out is the identification of risks to the project. This research uses qualitative methods and risk assessment and to makes a risk register. The results showed that the company carried out mitigation at certain stages, especially at extreme risk and high risk, which needed special attention because this risk would significantly impact project implementation. After mitigation, projects that have a high level of risk and inherent probability have decreased. Keywords—risk management, risk register, construction risk
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公寓开发项目风险管理的实施
在建设项目中,风险是难以预测的,因此需要进行风险分析。进行的第一个风险分析是识别项目的风险。本研究采用定性方法进行风险评估,并进行风险登记。结果表明,该公司在某些阶段进行了缓解,特别是在极端风险和高风险的情况下,需要特别注意,因为这种风险会严重影响项目的实施。在缓解之后,具有高水平风险和固有概率的项目减少了。关键词:风险管理,风险登记,工程风险
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Financial Analysis to Predict Financial Distress of Small and Medium-Sized Entities in Malang City Meaningful Learning: Improving Students’ Accounting Knowledge and Skills Through Learning Computer Accounting Practice Courses The Effect of Earning Management on Level of Stickiness Cost in Registered Consumer Goods Industry Sector Companies on the Indonesia Stock Exchange 2016-2018 Accounting Treatment for Cryptocurrency Mediating Role of Good Corporate Governance to Intellectual Capital and Firm Value
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1