Technical and technological solutions for the coal bed methane liquefaction projects

A. I. Gaivoronsky, M.V. Gorbunov
{"title":"Technical and technological solutions for the coal bed methane liquefaction projects","authors":"A. I. Gaivoronsky, M.V. Gorbunov","doi":"10.18698/0536-1044-2023-1-63-75","DOIUrl":null,"url":null,"abstract":"The paper presents technological and cost studies aimed at substantiating selection of technical and technological solutions in the coal bed methane liquefaction projects on the example of Naryksko-Ostashkinskoye and Taldinskoye methane-coal deposits in Kuzbass. Required capacity of the coal bed methane liquefaction plant is substantiated taking into account phasing of the capacity commissioning. Results of technological calculation of the preferred cycles of the coal bed methane liquefaction, as well as estimate of the cost of the main technological equipment of the compared options, are presented. It is concluded that it is necessary to adapt the initial deposit development project to the schedule for commissioning capacities of the coal bed methane liquefaction, and that using the SMR cycle is preferable.","PeriodicalId":198502,"journal":{"name":"Proceedings of Higher Educational Institutions. Маchine Building","volume":"201 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Higher Educational Institutions. Маchine Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18698/0536-1044-2023-1-63-75","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper presents technological and cost studies aimed at substantiating selection of technical and technological solutions in the coal bed methane liquefaction projects on the example of Naryksko-Ostashkinskoye and Taldinskoye methane-coal deposits in Kuzbass. Required capacity of the coal bed methane liquefaction plant is substantiated taking into account phasing of the capacity commissioning. Results of technological calculation of the preferred cycles of the coal bed methane liquefaction, as well as estimate of the cost of the main technological equipment of the compared options, are presented. It is concluded that it is necessary to adapt the initial deposit development project to the schedule for commissioning capacities of the coal bed methane liquefaction, and that using the SMR cycle is preferable.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
煤层气液化项目技术及工艺解决方案
本文以库兹巴斯的naryksko - ostashkinskye和Taldinskoye甲烷煤矿床为例,进行了技术和成本研究,以确定煤层气液化项目的技术和技术解决方案的选择。考虑到产能调试的分阶段进行,确定了煤层气液化装置所需的产能。给出了煤层气液化优选循环的工艺计算结果,以及比较方案中主要工艺设备的成本估算。认为有必要根据煤层气液化投产能力的时间表调整初始矿床开发项目,采用SMR循环是较好的选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Theoretical evaluation of efficiency of a spherical ball gear operating in the multiplier mode Transient processes in an active vibration isolation system with the vibroactive forces inertial compensator Tool and workpiece deformation effect in the cutting speed direction on the machining dynamics Method for calculating parameters of the equidistant toroidal shell of a composite balloon Approximate determination of losses in characteristic velocity and increments in flight altitude of the multistage launch vehicle upper stages
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1