Estimating Highway Preconstruction Services Costs. Volume 1: Guidebook

NCHRP Report Pub Date : 2016-07-27 DOI:10.17226/23590
D. Gransberg, H. D. Jeong, E. Craigie, J. Rueda-Benavides, K. Shrestha
{"title":"Estimating Highway Preconstruction Services Costs. Volume 1: Guidebook","authors":"D. Gransberg, H. D. Jeong, E. Craigie, J. Rueda-Benavides, K. Shrestha","doi":"10.17226/23590","DOIUrl":null,"url":null,"abstract":"This report presents guidance for state departments of transportation (DOTs) and other agencies for estimating pre-construction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. The guidance—a guidebook (Volume 1) and supporting research report (Volume 2)—addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation.","PeriodicalId":350472,"journal":{"name":"NCHRP Report","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NCHRP Report","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17226/23590","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This report presents guidance for state departments of transportation (DOTs) and other agencies for estimating pre-construction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. The guidance—a guidebook (Volume 1) and supporting research report (Volume 2)—addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
估算公路施工前服务成本。第一卷:旅游指南
本报告为各州交通部门(DOTs)和其他机构估计交通项目开发的施工前服务(PCS)成本提供了指导。PCS是指在桥梁、高速公路或其他交通项目施工开始前,由代理人员或顾问提供的各种项目特定工程和其他专业服务。该指南——一本指南手册(第一卷)和支持性研究报告(第二卷)——阐述了PCS成本的主要来源和组成部分、PCS估算方法、可能影响PCS成本的趋势(如设计和施工技术、设计标准、项目要求和专业劳动力的变化),以及对机构政策和实践的建议,这些建议可以通过改进PCS成本估算来帮助控制项目风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Civil Integrated Management (CIM) for Departments of Transportation, Volume 1: Guidebook Planning and Preliminary Engineering Applications Guide to the Highway Capacity Manual Leadership Guide for Strategic Information Management for State Departments of Transportation Estimating Highway Preconstruction Services Costs. Volume 2: Research Report Estimating Highway Preconstruction Services Costs. Volume 1: Guidebook
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1