Assessment of Impact on Project Cost and Schedule Due to Material Mismanagement in Trivandrum

Thanvin. Mohammed, Subitha Mary
{"title":"Assessment of Impact on Project Cost and Schedule Due to Material Mismanagement in Trivandrum","authors":"Thanvin. Mohammed, Subitha Mary","doi":"10.59544/qvbw1742/ngcesi23p104","DOIUrl":null,"url":null,"abstract":"The paper aims to fill a void created by the absence of proper materials management on construction sites. Research has shown that construction materials accounts for 50-60% of the total cost in construction projects. For a productive and cost efficiency, material management is very essential. Material mismanagement decrease the contractor’s profit leading to huge losses, and leaving the project in big troubles, therefore the proper management of this single largest component can improve the productivity and cost efficiency of a project and help ensure its timely completion. The existing construction material management practices of contracting companies are investigated in this paper. The study was exclusively assessed through questionnaire survey, interviews, field visits and discussion with the concerned authorities. 26 factors were selected for the proper assessment of most critical factors. The population for this research was all ongoing building construction project sites in Trivandrum and purposive sampling techniques were used. To achieve these research objectives questionnaire survey and interviews were used to collect relevant data from contractors, consultants and client representatives on-site. A total of 45 valid questionnaire survey was returned 31(83.78%) from contractors, 9(81.82%) from consultants and 5(62.50%) from clients. So that, based on the respondent’s agreement the relative importance index (RII) value and percentage were used to rank and explain their agreement by using Microsoft excel.","PeriodicalId":315694,"journal":{"name":"The International Conference on scientific innovations in Science, Technology, and Management","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The International Conference on scientific innovations in Science, Technology, and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59544/qvbw1742/ngcesi23p104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper aims to fill a void created by the absence of proper materials management on construction sites. Research has shown that construction materials accounts for 50-60% of the total cost in construction projects. For a productive and cost efficiency, material management is very essential. Material mismanagement decrease the contractor’s profit leading to huge losses, and leaving the project in big troubles, therefore the proper management of this single largest component can improve the productivity and cost efficiency of a project and help ensure its timely completion. The existing construction material management practices of contracting companies are investigated in this paper. The study was exclusively assessed through questionnaire survey, interviews, field visits and discussion with the concerned authorities. 26 factors were selected for the proper assessment of most critical factors. The population for this research was all ongoing building construction project sites in Trivandrum and purposive sampling techniques were used. To achieve these research objectives questionnaire survey and interviews were used to collect relevant data from contractors, consultants and client representatives on-site. A total of 45 valid questionnaire survey was returned 31(83.78%) from contractors, 9(81.82%) from consultants and 5(62.50%) from clients. So that, based on the respondent’s agreement the relative importance index (RII) value and percentage were used to rank and explain their agreement by using Microsoft excel.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Trivandrum物资管理不善对项目成本和进度的影响评估
本文旨在填补由于建筑工地缺乏适当的材料管理而造成的空白。研究表明,建筑材料占建筑工程总成本的50-60%。为了提高生产效率和成本效率,物料管理是非常必要的。材料管理不善会降低承包商的利润,造成巨大的损失,给项目带来很大的麻烦,因此,对这一最大的单一组成部分进行适当的管理,可以提高项目的生产率和成本效率,并有助于确保项目按时完成。本文对承包企业现有的建筑材料管理实践进行了调查。这项研究完全通过问卷调查、访谈、实地访问和与有关当局的讨论进行评估。选取26个因子,对最关键的因子进行适当的评价。本研究的人口是Trivandrum所有正在进行的建筑工程工地,并采用了有目的的抽样技术。为了实现这些研究目标,采用问卷调查和访谈的方式,从承包商、顾问和客户代表现场收集相关数据。共回收有效问卷45份,承包商31份(83.78%),顾问9份(81.82%),客户5份(62.50%)。因此,根据受访者的协议的相对重要性指数(RII)值和百分比被用来排序和解释他们的协议使用微软excel。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Automated Tongue Diagnosis: A Deep Autoencoder Neural Network and Clustering-Based Image Segmentation Approach A study on Organizational Culture and its Impact on Employees Behaviour with special reference to TTK Prestige Ltd, Coimbatore A Study on Effectiveness of Performance Appraisal System With Reference To Santhigiri Ashram, Trivandrum Early Stage Diabetes Prediction of Patients in Big Data Healthcare Using Sophisticated Machine Learning Approach A Study on Effectiveness of Motivational on Employee with Special Reference to Shiash Info Solutions Pvt Ltd, Chennai.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1