The suitability of MSP for engineering infrastructure

S. Mcgrath, S. Whitty
{"title":"The suitability of MSP for engineering infrastructure","authors":"S. Mcgrath, S. Whitty","doi":"10.19255/JMPM02217","DOIUrl":null,"url":null,"abstract":"This paper arose from empirical investigations of practitioner views of both governance and program definitions together with investigations of practitioner reference documents. These investigations indicated that some confusion had arisen in infrastructure project management as a result of approaches used in IT. This paper contributes to the literature evaluating project standards and methodologies by conducting an examination of the suitability of one such source (MSP) for use in in engineering infrastructure program management. A deductive definitional approach is taken to identify features that could cause difficulty. Eight features were examined and six were found to have difficulty in application to engineering infrastructure. The remaining two were found to be terminology differences that are unlikely to cause too much difficulty. The features causing difficulty include inappropriate definition of a program, use of a non-generic process flow unsuitable for rolling programs, confusion of transformation projects with programs, presumption of a board governance model, and confusion of large projects with programs. The paper concludes that MSP is quite poorly suited to managing rolling programs, whether they are in engineering infrastructure or IT. Various changes to MSP and PMI publications are recommended.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"163 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02217","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper arose from empirical investigations of practitioner views of both governance and program definitions together with investigations of practitioner reference documents. These investigations indicated that some confusion had arisen in infrastructure project management as a result of approaches used in IT. This paper contributes to the literature evaluating project standards and methodologies by conducting an examination of the suitability of one such source (MSP) for use in in engineering infrastructure program management. A deductive definitional approach is taken to identify features that could cause difficulty. Eight features were examined and six were found to have difficulty in application to engineering infrastructure. The remaining two were found to be terminology differences that are unlikely to cause too much difficulty. The features causing difficulty include inappropriate definition of a program, use of a non-generic process flow unsuitable for rolling programs, confusion of transformation projects with programs, presumption of a board governance model, and confusion of large projects with programs. The paper concludes that MSP is quite poorly suited to managing rolling programs, whether they are in engineering infrastructure or IT. Various changes to MSP and PMI publications are recommended.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
MSP在工程基础设施中的适用性
本文源于对实践者对治理和规划定义的观点的实证调查,以及对实践者参考文献的调查。这些调查表明,由于IT中使用的方法,在基础设施项目管理中出现了一些混乱。本文通过对工程基础设施项目管理中使用的此类资源(MSP)的适用性进行检查,为评估项目标准和方法的文献做出了贡献。采用演绎定义方法来识别可能造成困难的特征。研究了8个特征,发现6个特征在工程基础设施应用中存在困难。剩下的两个是术语上的差异,不太可能造成太大的困难。造成困难的特征包括不适当的程序定义,不适合滚动程序的非通用过程流的使用,转换项目与程序的混淆,董事会治理模型的假设,以及大型项目与程序的混淆。本文的结论是,MSP非常不适合管理滚动计划,无论是在工程基础设施还是IT中。建议对MSP和PMI出版物进行各种更改。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Project recovery: Project failures and how to get rid of them Agile Enhancement of Critical PMBoK v6 Processes Whole Life Program Success, Leadership Competencies and Motivation for Learning – UK Defence Case Project Resource Optimization Considering Labor Productivity Factors Service based framework of research projects in higher education institutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1