A Research on the Reconstruction Project for the Main Gate Area of the U University Campus

Kwang-Hee Lee
{"title":"A Research on the Reconstruction Project for the Main Gate Area of the U University Campus","authors":"Kwang-Hee Lee","doi":"10.7743/KISS.2011.10.1.001","DOIUrl":null,"url":null,"abstract":"In order to solve the current shortage of parking spaces, and redesign the main gate area of the U University, the research investigated some cases of other schools located in Seoul which actively constructed multi-purpose building structures. Those schools are considered to be good samples showing their efforts to fulfill the needs of more parking spaces in their campuses, and to cover with the growing needs of multi-functioned facilities accommodating services of academic affairs, reading room spaces, and amenities. With the investigation, the research finded out the current trends of campus developments from the sample schools, such as underground parking facilities connected with multi-purpose buildings along the main arteries of campuses. Following the trends the research thoroughly examined the present conditions of our school and tried to make some possible alternatives for the facilities. Under the conditions, the research suggested 1)to construct underground parking lots accepting around 1,000 cars under the ivory tower square located in front of University Administration Building, 2)to develop a big-scaled open square at the university main gate, and 3)to build a multi-purpose structure along the main street of the campus, which included administration services, studying spaces, and some commercial facilities.","PeriodicalId":420111,"journal":{"name":"The journal of Sustainable Design and Educational Environment Research","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The journal of Sustainable Design and Educational Environment Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7743/KISS.2011.10.1.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In order to solve the current shortage of parking spaces, and redesign the main gate area of the U University, the research investigated some cases of other schools located in Seoul which actively constructed multi-purpose building structures. Those schools are considered to be good samples showing their efforts to fulfill the needs of more parking spaces in their campuses, and to cover with the growing needs of multi-functioned facilities accommodating services of academic affairs, reading room spaces, and amenities. With the investigation, the research finded out the current trends of campus developments from the sample schools, such as underground parking facilities connected with multi-purpose buildings along the main arteries of campuses. Following the trends the research thoroughly examined the present conditions of our school and tried to make some possible alternatives for the facilities. Under the conditions, the research suggested 1)to construct underground parking lots accepting around 1,000 cars under the ivory tower square located in front of University Administration Building, 2)to develop a big-scaled open square at the university main gate, and 3)to build a multi-purpose structure along the main street of the campus, which included administration services, studying spaces, and some commercial facilities.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
U大学校园正门区改造工程研究
为了解决目前的停车空间短缺问题,并重新设计U大学的正门区域,本研究调查了首尔其他学校积极建造多功能建筑结构的一些案例。这些学校被认为是很好的例子,表明他们努力满足校园内更多停车位的需求,并满足日益增长的多功能设施的需求,包括教务服务、阅览室空间和设施。通过调查,研究人员从样本学校中发现了校园发展的当前趋势,例如校园主干道沿线与多用途建筑相连的地下停车场设施。随着趋势的发展,研究彻底检查了我们学校的现状,并试图为这些设施做出一些可能的选择。在此条件下,研究建议:1)在大学行政大楼前象牙塔广场下建设可容纳1000辆左右汽车的地下停车场;2)在大学正门处开发大型露天广场;3)沿着校园主干道建设多功能建筑,包括行政服务、学习空间和一些商业设施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Evaluation Method of Deterioration Level of Elementary, Middle, and High School Analyzing the Possibility of the Building Integrated Photovoltaic with DSC by the Case Studies Proposing provisions of Standard Repair Method of Painting Work Defect by Lawsuit Case Study A Study on Comparison and Shortening of Evacuation Time Required of University Library by Simulation A Study on the Development of Facility Model for Safety Training Class in School
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1