Minimizing mean flow time with release time and deadline constraints

J. Du, J. Leung
{"title":"Minimizing mean flow time with release time and deadline constraints","authors":"J. Du, J. Leung","doi":"10.1109/REAL.1988.51097","DOIUrl":null,"url":null,"abstract":"The problem of preemptively scheduling a task system consisting of a set of n independent tasks on one processor so as to minimize the mean flow time is considered. The goal is to find a preemptive schedule such that the mean flow time is minimized subject to the constraint that task T/sub i/ is executed within the interval between its release time and its deadline. Such a schedule, if it exists, is called an optimal schedule. It is shown that the problem of finding an optimal schedule is NP-hard. A greedy algorithm is given to find an optimal schedule for a large class of task systems.<<ETX>>","PeriodicalId":116211,"journal":{"name":"Proceedings. Real-Time Systems Symposium","volume":"30 4","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"35","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Real-Time Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REAL.1988.51097","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 35

Abstract

The problem of preemptively scheduling a task system consisting of a set of n independent tasks on one processor so as to minimize the mean flow time is considered. The goal is to find a preemptive schedule such that the mean flow time is minimized subject to the constraint that task T/sub i/ is executed within the interval between its release time and its deadline. Such a schedule, if it exists, is called an optimal schedule. It is shown that the problem of finding an optimal schedule is NP-hard. A greedy algorithm is given to find an optimal schedule for a large class of task systems.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
最小化平均流程时间与发布时间和截止日期的限制
研究了一个由n个独立任务组成的任务系统在一个处理器上的优先调度问题,以使平均流时间最小。目标是找到一个抢占式调度,使得在任务T/子i/在其释放时间和截止日期之间的间隔内执行的约束下,平均流时间最小化。这样的时间表,如果存在,就称为最优时间表。结果表明,寻找最优调度是np困难问题。给出了一类大型任务系统的最优调度贪心算法[j]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.00
自引率
0.00%
发文量
0
期刊最新文献
Process dependent static cache partitioning for real-time systems New approaches for the reconfiguration of two-dimensional VLSI arrays using time-redundancy A real time parallel processing data acquisition system On the graceful degradation of phase-locked clocks Support for high-priority traffic in VLSI communication switches
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1