{"title":"Problems of the construction industry of the Russian Federation in 2021 and in the beginning of 2022","authors":"E. Ganebnykh","doi":"10.33920/str-01-2202-08","DOIUrl":null,"url":null,"abstract":"The author studied the statistical and analytical materials illustrating the situation in the construction industry of the Russian Federation in 2021 and in the beginnings of 2022. The main problems and possible ways of their solution are revealed.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2202-08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The author studied the statistical and analytical materials illustrating the situation in the construction industry of the Russian Federation in 2021 and in the beginnings of 2022. The main problems and possible ways of their solution are revealed.