File and team management on remotely-worked building information modelling project

Gregorius A Gegana A, Fauzan Alfi Agirachman
{"title":"File and team management on remotely-worked building information modelling project","authors":"Gregorius A Gegana A, Fauzan Alfi Agirachman","doi":"10.1109/ICRIIS.2017.8002446","DOIUrl":null,"url":null,"abstract":"BIM process makes shift in design and construction process by promoting transparency and encouraging seamless global collaboration between team members. Although it is not as rigorous in western countries, BIM is starting to gain momentum in Indonesia as more projects nowadays requires BIM in their design-and-build process due to global market demands. This paper presents case study of BIM usage in two projects: new construction of BNI Tower and renovation of GBK National Stadium. We look how BIM was involved in project phases and how the BIM process, models, and team members were managed as the team worked remotely from different cities. In the end, based on these projects experiences, we discuss how the best BIM practices can be derived and applied in the future.","PeriodicalId":384130,"journal":{"name":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRIIS.2017.8002446","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

BIM process makes shift in design and construction process by promoting transparency and encouraging seamless global collaboration between team members. Although it is not as rigorous in western countries, BIM is starting to gain momentum in Indonesia as more projects nowadays requires BIM in their design-and-build process due to global market demands. This paper presents case study of BIM usage in two projects: new construction of BNI Tower and renovation of GBK National Stadium. We look how BIM was involved in project phases and how the BIM process, models, and team members were managed as the team worked remotely from different cities. In the end, based on these projects experiences, we discuss how the best BIM practices can be derived and applied in the future.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
远程办公建筑信息建模项目的文件和团队管理
BIM过程通过提高透明度和鼓励团队成员之间的无缝全球协作,改变了设计和施工过程。虽然在西方国家还没有那么严格,但由于全球市场的需求,现在越来越多的项目在设计和建造过程中需要BIM,因此BIM在印度尼西亚开始获得动力。本文介绍了BIM在BNI大厦新建和GBK国家体育场改造两个项目中的应用。我们将了解BIM如何参与项目阶段,以及当团队在不同城市远程工作时,BIM流程、模型和团队成员是如何管理的。最后,根据这些项目的经验,我们讨论了如何在未来获得和应用最佳BIM实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A firm and individual characteristic-based prediction model for E2.0 continuance adoption Understanding knowledge management behavior from a social exchange perspective Healthcare employees' perception on information privacy concerns Detection and prevention of possible unauthorized login attempts through stolen credentials from a phishing attack in an online banking system Resolving data duplication, inaccuracy and inconsistency issues using Master Data Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1