{"title":"Order of change of contracts for building in 2022","authors":"E. G. Zaluzhnaya","doi":"10.33920/str-01-2212-04","DOIUrl":null,"url":null,"abstract":"In 2022 government supported the civil engineering firms in the conditions of sanctions and permitted to change essential conditions of construction contracts. The author of the article considers the case, when it is possible to make changes in the agreement and investigates how to recalculate the cost of works.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"86 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2212-04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In 2022 government supported the civil engineering firms in the conditions of sanctions and permitted to change essential conditions of construction contracts. The author of the article considers the case, when it is possible to make changes in the agreement and investigates how to recalculate the cost of works.