PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2023-01-01 DOI:10.7166/34-2-2760
Suzaan Pretorius, Herman Steyn, Taryn Jane Bond-Barnard
{"title":"PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES","authors":"Suzaan Pretorius, Herman Steyn, Taryn Jane Bond-Barnard","doi":"10.7166/34-2-2760","DOIUrl":null,"url":null,"abstract":"This paper explores whether organisations in a developing country have become more mature over time in their project management practices, and compares the current state to findings from a similar study conducted in 2010. It thus contributes to the scant literature on project management maturity in developing countries. Six hundred responses to a project management maturity questionnaire were used to investigate the perceived project management success of 9 389 projects. The results indicated that the perceived average project management maturity dropped from the 2010 value of 2.88 to 2.64 in 2020. Despite this, most of the projects surveyed were still perceived as successful. Keywords: Project management maturity, project management success, developing countries","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"282 1","pages":"0"},"PeriodicalIF":0.5000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7166/34-2-2760","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

Abstract

This paper explores whether organisations in a developing country have become more mature over time in their project management practices, and compares the current state to findings from a similar study conducted in 2010. It thus contributes to the scant literature on project management maturity in developing countries. Six hundred responses to a project management maturity questionnaire were used to investigate the perceived project management success of 9 389 projects. The results indicated that the perceived average project management maturity dropped from the 2010 value of 2.88 to 2.64 in 2020. Despite this, most of the projects surveyed were still perceived as successful. Keywords: Project management maturity, project management success, developing countries
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
发展中国家项目管理成熟度与项目管理成功
本文探讨了发展中国家的组织是否随着时间的推移在项目管理实践中变得更加成熟,并将目前的状态与2010年进行的一项类似研究的结果进行了比较。因此,它有助于发展中国家项目管理成熟度方面的文献匮乏。对项目管理成熟度问卷的六百份回复被用来调查9389个项目的感知项目管理成功。结果表明,感知平均项目管理成熟度从2010年的2.88下降到2020年的2.64。尽管如此,大多数被调查的项目仍然被认为是成功的。关键词:项目管理成熟度,项目管理成功,发展中国家
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1