LEAN SIX SIGMA METHODOLOGY TO REDUCE EXCESS WASTAGE IN A BRICKYARD: A CASE STUDY

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2023-01-01 DOI:10.7166/34-2-2865
Juan Carlos Quiroz Flores, IF Varas, Ahad Ali
{"title":"LEAN SIX SIGMA METHODOLOGY TO REDUCE EXCESS WASTAGE IN A BRICKYARD: A CASE STUDY","authors":"Juan Carlos Quiroz Flores, IF Varas, Ahad Ali","doi":"10.7166/34-2-2865","DOIUrl":null,"url":null,"abstract":"Peruvian companies’ craft brick stands currently experience significant growth in sales. Thus brickyards seek to reduce the amount of waste to increase productivity and reduce cost overruns. In this study, the problem that has the greatest economic impact on a brick company is the excessive amount of waste. For this reason, the implementation of a model based on the Lean Six Sigma (LSS) methodology is proposed, applying Poka Yoke, Jidoka, Standardised Work, and Just in Time in order to reduce the number of defective bricks and cost overruns. The research project focused on the tambourine brick, the type whose percentage of generated waste is the highest in the production batch. To do this, the current situation was analysed; the main causes of the problem were identified and measured; and then Lean Six Sigma tools were used to attack the root cause. Finally, the proposed design reduced overheated bricks by 2.36%, wet bricks by 2.01%, and poorly stacked bricks by 1.8%, obtaining a 6.92% reduction in shrinkage and increasing the level of Six Sigma to 3.9, which contributed to the reduction of losses in the brickyard. Keywords: Lean Six Sigma, Poka Yoke, Jidoka, Standardized Work, brickyard, waste","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"60 1","pages":"0"},"PeriodicalIF":0.5000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7166/34-2-2865","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Peruvian companies’ craft brick stands currently experience significant growth in sales. Thus brickyards seek to reduce the amount of waste to increase productivity and reduce cost overruns. In this study, the problem that has the greatest economic impact on a brick company is the excessive amount of waste. For this reason, the implementation of a model based on the Lean Six Sigma (LSS) methodology is proposed, applying Poka Yoke, Jidoka, Standardised Work, and Just in Time in order to reduce the number of defective bricks and cost overruns. The research project focused on the tambourine brick, the type whose percentage of generated waste is the highest in the production batch. To do this, the current situation was analysed; the main causes of the problem were identified and measured; and then Lean Six Sigma tools were used to attack the root cause. Finally, the proposed design reduced overheated bricks by 2.36%, wet bricks by 2.01%, and poorly stacked bricks by 1.8%, obtaining a 6.92% reduction in shrinkage and increasing the level of Six Sigma to 3.9, which contributed to the reduction of losses in the brickyard. Keywords: Lean Six Sigma, Poka Yoke, Jidoka, Standardized Work, brickyard, waste
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
减少砖厂多余浪费的精益六西格玛方法:案例研究
秘鲁公司的工艺砖摊位目前的销售额显著增长。因此,砖厂寻求减少浪费的数量,以提高生产率和减少成本超支。在本研究中,对砖厂经济影响最大的问题是浪费过多。出于这个原因,提出了基于精益六西格玛(LSS)方法的模型的实施,应用Poka Yoke, Jidoka,标准化工作和Just in Time,以减少缺陷砖的数量和成本超支。该研究项目的重点是铃鼓砖,这是生产批次中产生的废物百分比最高的类型。为此,对现状进行了分析;确定并测量了问题的主要原因;然后使用精益六西格玛工具来解决根本原因。最后,本设计减少过热砖2.36%、湿砖2.01%、堆放不良砖1.8%,收缩率降低6.92%,六西格玛水平提高到3.9,减少了砖厂的损失。关键词:精益六西格玛,Poka Yoke, jiidoka,标准化工作,砖厂,废物
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1