PERANCANGAN PLTS TERAPUNG UNTUK MENDUKUNG WISATA HIJAU DI BENDUNGAN TAMBLANG, DESA SAWAN, KABUPATEN BULELENG

K. Cakrawenda Yoga Laksana, I.A. Dwi Giriantar, I W. Sukerayasa
{"title":"PERANCANGAN PLTS TERAPUNG UNTUK MENDUKUNG WISATA HIJAU DI BENDUNGAN TAMBLANG, DESA SAWAN, KABUPATEN BULELENG","authors":"K. Cakrawenda Yoga Laksana, I.A. Dwi Giriantar, I W. Sukerayasa","doi":"10.24843/spektrum.2023.v10.i03.p5","DOIUrl":null,"url":null,"abstract":"The Province of Bali have many dams, one of it is the Tamblang Dam, which is located in Sawan Village, Sawan District, Buleleng Regency. The Government of Buleleng Regency is planning to make Tamblang Dam as a new Tourist Destination Area (Daerah Tujuan Wisata or (DTW) in order to improve the existing tourism conditions in North Bali. It is planned to utilizing Renewable Energy (Energi Baru Terbarukan or EBT) sources to support the needs of DTW and to support government programs to reaching the Bali's clean energy target on 2050. The Renewable Energy Power Plant that will be designed is a Floating Solar Photovoltaic (PV) Power Plant, as it the potential source of energy considering that Indonesia is located on the equator. The Solar PV Power Plant is designed using the tool from website by utilizing 5% of the surface area of the dam water which is 4,561.97 m2, based on Kementrian PUPR no 6 Tahun 2020 regulation. So that a Floating Solar PV Power Plant capacity of 0.6 MW is obtained by using 1,533 solar modules and produce energy reaching of 926,539 kWh in a year. The designed Floating PV need an initial investment cost of IDR 13,551,481,157, with the result of economic analysis, obtained value of each parameter including the NPV value is IDR 7,470,053,884, BCR is 2.66, and PP is less than 25 years.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i03.p5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Province of Bali have many dams, one of it is the Tamblang Dam, which is located in Sawan Village, Sawan District, Buleleng Regency. The Government of Buleleng Regency is planning to make Tamblang Dam as a new Tourist Destination Area (Daerah Tujuan Wisata or (DTW) in order to improve the existing tourism conditions in North Bali. It is planned to utilizing Renewable Energy (Energi Baru Terbarukan or EBT) sources to support the needs of DTW and to support government programs to reaching the Bali's clean energy target on 2050. The Renewable Energy Power Plant that will be designed is a Floating Solar Photovoltaic (PV) Power Plant, as it the potential source of energy considering that Indonesia is located on the equator. The Solar PV Power Plant is designed using the tool from website by utilizing 5% of the surface area of the dam water which is 4,561.97 m2, based on Kementrian PUPR no 6 Tahun 2020 regulation. So that a Floating Solar PV Power Plant capacity of 0.6 MW is obtained by using 1,533 solar modules and produce energy reaching of 926,539 kWh in a year. The designed Floating PV need an initial investment cost of IDR 13,551,481,157, with the result of economic analysis, obtained value of each parameter including the NPV value is IDR 7,470,053,884, BCR is 2.66, and PP is less than 25 years.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在布勒楞县 SAWAN 村 TAMBLANG 大坝设计支持绿色旅游的浮动广场
巴厘岛省有许多水坝,其中之一是Tamblang水坝,它位于布莱连县萨旺区萨旺村。Buleleng县政府正计划将Tamblang大坝作为一个新的旅游目的地区(Daerah Tujuan Wisata or (DTW)),以改善北巴厘岛现有的旅游条件。计划利用可再生能源(Energi Baru Terbarukan或EBT)资源来支持DTW的需求,并支持政府项目,以实现2050年巴厘岛清洁能源目标。将设计的可再生能源发电厂是一个浮动太阳能光伏(PV)发电厂,考虑到印度尼西亚位于赤道,它是潜在的能源来源。太阳能光伏电站是根据Kementrian PUPR no 6 Tahun 2020法规,利用大坝水表面面积的5%(4561.97平方米)使用网站上的工具设计的。因此,通过使用1,533个太阳能组件,可获得0.6兆瓦的浮动太阳能光伏电站容量,每年可产生926,539千瓦时的能源。设计的浮动式光伏电站初始投资成本为13,551,481,157印尼盾,经经济分析,得到NPV值为7,470,053,884印尼盾,BCR为2.66,PP小于25年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
期刊最新文献
PERBANDINGAN METODE KLASIFIKASI SUPPORT VECTOR MACHINE DAN NAÏVE BAYES PADA ANALISIS SENTIMEN KENDARAAN LISTRIK STUDI PENGURANGAN EMISI KARBON SISTEM KETENAGALISTRIKAN PROVINSI BALI: ANALISIS RUPTL 2021-2030 PERANCANGAN PLTS TERAPUNG UNTUK MENDUKUNG WISATA HIJAU DI BENDUNGAN TAMBLANG, DESA SAWAN, KABUPATEN BULELENG RANCANG BANGUN APLIKASI MOBILE WEB UNTUK MARKETPLACE KLINIK HEWAN PENINGKATAN KEANDALAN PENYULANG TUKAD MUSI DAN PENYULANG BATANGHARI PT.PLN (PERSERO) UP3 BALI SELATAN ULP SANUR DENGAN POLA RADIAL
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1