PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) OFF GRID DI PT. GEBER SAMUDRA

Suryo Aji Wicaksono, Rukmi Sari Hartati, I Wayan Sukerayasa
{"title":"PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) OFF GRID DI PT. GEBER SAMUDRA","authors":"Suryo Aji Wicaksono, Rukmi Sari Hartati, I Wayan Sukerayasa","doi":"10.24843/spektrum.2023.v10.i03.p8","DOIUrl":null,"url":null,"abstract":"Indonesia has a great opportunity to utilize new renewable energy sources for conversion to electric power. One possible use of renewable energy is solar power plants (PLTS). The average potential of solar energy in Indonesia is around 4.8 kWh/m2/day. Therefore, this study is related to the design of PLTS on the roof of PT. Geber Samudra is off the grid. The design of this solar power plant is made with the help of Helioscope software with a total roof area of 125.71 m2 and a roof slope of 20°. The potential power generated is 9.8 kWp and the total annual energy production is 15.56 MWh. It takes 28 pieces of UKSOL UKs-6M 350wp solar panels, 1 Solax X3 HYBRID 10.0 T type inverter with a capacity of 10 kW, and 6 units of 48V 100Ah batteries assembled in series. Based on the results of PLTS roof design can be analyzed that the planning of PLTS roof at PT. Geber Samudra is considered worthy because it meets the criteria of net present value (NPV) of Rp. 25.603.062 is greater than zero. The Benefit-Cost Ratio (B-CR) is greater than one which is 1.12, and the discounted payback period (DPP) is 21,8 years and is achieved at the age of PLTS with the assumption of operating for 25 years.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i03.p8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Indonesia has a great opportunity to utilize new renewable energy sources for conversion to electric power. One possible use of renewable energy is solar power plants (PLTS). The average potential of solar energy in Indonesia is around 4.8 kWh/m2/day. Therefore, this study is related to the design of PLTS on the roof of PT. Geber Samudra is off the grid. The design of this solar power plant is made with the help of Helioscope software with a total roof area of 125.71 m2 and a roof slope of 20°. The potential power generated is 9.8 kWp and the total annual energy production is 15.56 MWh. It takes 28 pieces of UKSOL UKs-6M 350wp solar panels, 1 Solax X3 HYBRID 10.0 T type inverter with a capacity of 10 kW, and 6 units of 48V 100Ah batteries assembled in series. Based on the results of PLTS roof design can be analyzed that the planning of PLTS roof at PT. Geber Samudra is considered worthy because it meets the criteria of net present value (NPV) of Rp. 25.603.062 is greater than zero. The Benefit-Cost Ratio (B-CR) is greater than one which is 1.12, and the discounted payback period (DPP) is 21,8 years and is achieved at the age of PLTS with the assumption of operating for 25 years.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计划在GEBER sea电网外的太阳能发电厂
印度尼西亚有很大的机会利用新的可再生能源转化为电力。可再生能源的一个可能用途是太阳能发电厂(PLTS)。印度尼西亚太阳能的平均潜力约为4.8千瓦时/平方米/天。因此,本研究涉及PT屋顶PLTS的设计。Geber Samudra是离网的。该太阳能电站的设计是借助Helioscope软件完成的,屋顶总面积125.71 m2,屋顶坡度为20°。潜在发电量9.8 kWp,年总发电量15.56 MWh。它需要28块UKSOL UKs-6M 350wp太阳能电池板,1个容量为10千瓦的Solax X3 HYBRID 10.0 T型逆变器,6个48V 100Ah电池串联起来。根据PLTS屋顶设计的结果可以分析,PT. Geber Samudra的PLTS屋顶规划是值得考虑的,因为它满足净现值(NPV) Rp. 25.603.062大于零的标准。效益成本比(B-CR)大于1.12,贴现回收期(DPP)为21.8年,在PLTS的年龄,假设运行25年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
期刊最新文献
PERBANDINGAN METODE KLASIFIKASI SUPPORT VECTOR MACHINE DAN NAÏVE BAYES PADA ANALISIS SENTIMEN KENDARAAN LISTRIK STUDI PENGURANGAN EMISI KARBON SISTEM KETENAGALISTRIKAN PROVINSI BALI: ANALISIS RUPTL 2021-2030 PERANCANGAN PLTS TERAPUNG UNTUK MENDUKUNG WISATA HIJAU DI BENDUNGAN TAMBLANG, DESA SAWAN, KABUPATEN BULELENG RANCANG BANGUN APLIKASI MOBILE WEB UNTUK MARKETPLACE KLINIK HEWAN PENINGKATAN KEANDALAN PENYULANG TUKAD MUSI DAN PENYULANG BATANGHARI PT.PLN (PERSERO) UP3 BALI SELATAN ULP SANUR DENGAN POLA RADIAL
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1