Analysis of New Loleo Airport Facilities in Tidore City Islands

None Sudirman Hi Umar, None Muhammad Taufiq Y.S, None Nurmaiyasa Marsaoly
{"title":"Analysis of New Loleo Airport Facilities in Tidore City Islands","authors":"None Sudirman Hi Umar, None Muhammad Taufiq Y.S, None Nurmaiyasa Marsaoly","doi":"10.47577/technium.v17i.10080","DOIUrl":null,"url":null,"abstract":"The construction of a new airport in Loleo Tidore Islands City acts as a transportation network node and supports economic growth and local government activities in North Maluku, that this airport is projected for the connectivity of the IWIP Industrial Estate and the capital of North Maluku Province (Sofifi City). The data collection methods used in this study include observation and literature study. The analyzed facilities consist of airside facilities consisting of a runway, taxiway, and apron. While the land-side facilities to be analysed consist of facilities in public zones, technical zones, and supporting zones. Other facilities that will be analysed also in this study consist of flight navigation facilities, visual landing aids, communication and information facilities, PKP-PK facilities, and PLLU facilities. The results of the analysis of total land requirements for the construction of new airport facilities in Loleo City Tidore Islands phase 1 amounted to 200 Ha and phase 2 amounted to 200 Ha so the total land needed was 400 Ha. The annual passenger movement of Phase I amounted to 569,443 passengers in Phase II amounted to 1,175,839 passengers, the plan the length of the runway Phase I along 1600 m served the largest aircraft ATR 72-600, and phase II 2500 m served the largest aircraft, namely Boeing 737-900 ER, and the farthest route of phase I development was Loleo - Ambon and the farthest route of phase II development was Loleo – Jakarta.","PeriodicalId":490649,"journal":{"name":"Technium","volume":"76 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47577/technium.v17i.10080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of a new airport in Loleo Tidore Islands City acts as a transportation network node and supports economic growth and local government activities in North Maluku, that this airport is projected for the connectivity of the IWIP Industrial Estate and the capital of North Maluku Province (Sofifi City). The data collection methods used in this study include observation and literature study. The analyzed facilities consist of airside facilities consisting of a runway, taxiway, and apron. While the land-side facilities to be analysed consist of facilities in public zones, technical zones, and supporting zones. Other facilities that will be analysed also in this study consist of flight navigation facilities, visual landing aids, communication and information facilities, PKP-PK facilities, and PLLU facilities. The results of the analysis of total land requirements for the construction of new airport facilities in Loleo City Tidore Islands phase 1 amounted to 200 Ha and phase 2 amounted to 200 Ha so the total land needed was 400 Ha. The annual passenger movement of Phase I amounted to 569,443 passengers in Phase II amounted to 1,175,839 passengers, the plan the length of the runway Phase I along 1600 m served the largest aircraft ATR 72-600, and phase II 2500 m served the largest aircraft, namely Boeing 737-900 ER, and the farthest route of phase I development was Loleo - Ambon and the farthest route of phase II development was Loleo – Jakarta.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
蒂多城市群岛新罗里奥机场设施分析
在Loleo Tidore群岛城市建设的新机场作为交通网络节点,支持北马鲁古的经济增长和地方政府活动,该机场预计将连接IWIP工业园区和北马鲁古省首府(Sofifi市)。本研究的资料收集方法包括观察法和文献研究法。分析的设施包括由跑道、滑行道和停机坪组成的空侧设施。而待分析的陆上设施则包括公共区、技术区和配套区的设施。本研究还将分析的其他设施包括飞行导航设施、目视着陆辅助设施、通信和信息设施、PKP-PK设施和PLLU设施。在罗里奥市蒂多尔群岛建造新机场设施第一期所需土地总量为200公顷,第二期所需土地总量为200公顷,因此所需土地总量为400公顷。一期机场年客运量569,443人次,二期机场年客运量1,175,839人次,一期机场跑道长度为1600米,最大飞机为ATR 72-600,二期跑道长度为2500米,最大飞机为波音737-900 ER,一期开发最远航线为Loleo -安汶,二期开发最远航线为Loleo -雅加达。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Internal Boiler Water Treatment Maintenance System on Boiler Operation in KM. Bukit Raya Electric Parameter Measurement on Main Generator Based on IoT for Safe Operational Feasibility Design of half circular wideband antenna for ship radar The Proof of the Collatz Conjecture Sentiment Analysis for Indonesian Salt Policy uses Naïve Bayes and Information Gain Methods
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1