Anne Sihombing, Joni Joni, Yane Ansanay, Enos Karapa, Herbert Innah, Prihananto Setiadji, Johni Jonatan Numberi, Tiper K. M. Uniplaita
{"title":"Analisis Keandalan Pembangkit Listrik Tenaga Mini Hidro Orya-Genyem Berdasarkan Load of Loss Probability","authors":"Anne Sihombing, Joni Joni, Yane Ansanay, Enos Karapa, Herbert Innah, Prihananto Setiadji, Johni Jonatan Numberi, Tiper K. M. Uniplaita","doi":"10.35814/asiimetrik.v5i2.5128","DOIUrl":null,"url":null,"abstract":"Electricity is crucial for supporting development, the economy, and human well-being, thus leading to an increasing demand for electrical energy. Therefore, power plants are planned and constructed to be as economically viable as possible. In line with the principles of affordability, security of supply, and acceptability, to ensure long-term capacity demand and reliability. The reliability of the power plant is measured using the Load of Loss Probability (LOLP) index, which assesses the probability of components functioning satisfactorily to meet demand. The objective of this research is to analyze the reliability of PLTM Orya-Genyem based on the Load of Loss Probability (LOLP) index. The research methodology is qualitative, commencing with the collection of secondary data, followed by LOLP calculations to obtain reliability information. LOLP index for PLTM Orya-GGenyem is 0,4204%, equivalent to 1,5346 days per year, exceeding the PLN standard of 1 day per year. This indicates a lack of reliability in the power plant. Research findings reveal that daily power demand increases by 0,054 MW for every 1% increase in time. Assessment indicates that peak load surge factor is not the cause of the high LOLP value in PLTM Orya-Genyem. Instead, outages are the cause. The assessment shows that there were 72 disturbances of maintenance outages for PLOG-TA-01 and 145 disturbances of system adjustment outages for PLOG-TA-02. Other outages that happen include low water elevation, water storage duration, floods (accumulated debris), transmission work, blackouts, network disturbances, forced outages, planned outages, sedimentation dredging, water drainage, water filling, performance testing, and maintenance during plant operation.","PeriodicalId":490621,"journal":{"name":"Jurnal Asiimetrik","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Asiimetrik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35814/asiimetrik.v5i2.5128","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Electricity is crucial for supporting development, the economy, and human well-being, thus leading to an increasing demand for electrical energy. Therefore, power plants are planned and constructed to be as economically viable as possible. In line with the principles of affordability, security of supply, and acceptability, to ensure long-term capacity demand and reliability. The reliability of the power plant is measured using the Load of Loss Probability (LOLP) index, which assesses the probability of components functioning satisfactorily to meet demand. The objective of this research is to analyze the reliability of PLTM Orya-Genyem based on the Load of Loss Probability (LOLP) index. The research methodology is qualitative, commencing with the collection of secondary data, followed by LOLP calculations to obtain reliability information. LOLP index for PLTM Orya-GGenyem is 0,4204%, equivalent to 1,5346 days per year, exceeding the PLN standard of 1 day per year. This indicates a lack of reliability in the power plant. Research findings reveal that daily power demand increases by 0,054 MW for every 1% increase in time. Assessment indicates that peak load surge factor is not the cause of the high LOLP value in PLTM Orya-Genyem. Instead, outages are the cause. The assessment shows that there were 72 disturbances of maintenance outages for PLOG-TA-01 and 145 disturbances of system adjustment outages for PLOG-TA-02. Other outages that happen include low water elevation, water storage duration, floods (accumulated debris), transmission work, blackouts, network disturbances, forced outages, planned outages, sedimentation dredging, water drainage, water filling, performance testing, and maintenance during plant operation.
电力对于支持发展、经济和人类福祉至关重要,因此导致对电能的需求不断增加。因此,发电厂的规划和建造都尽可能在经济上可行。本着负担得起、供应安全、可接受的原则,确保长期容量需求和可靠性。发电厂的可靠性是用损失率负荷(LOLP)指标来衡量的,该指标评估了组件运行满意地满足需求的概率。本研究的目的是基于损失概率负荷(Load of Loss Probability, LOLP)指标分析PLTM Orya-Genyem的可靠性。研究方法是定性的,从收集二手数据开始,然后进行LOLP计算以获得可靠性信息。PLTM Orya-GGenyem的LOLP指数为0,4204%,相当于每年1,5346天,超过PLN每年1天的标准。这表明电厂缺乏可靠性。研究结果显示,时间每增加1%,每日电力需求就会增加0,054 MW。评估表明,峰值负荷浪涌因子不是PLTM Orya-Genyem的高LOLP值的原因。相反,停电才是原因。评估结果表明,PLOG-TA-01有72次维护中断干扰,PLOG-TA-02有145次系统调整中断干扰。发生的其他中断包括低水位、储水时间、洪水(堆积的碎片)、输电工作、停电、网络干扰、强制中断、计划中断、沉淀物疏浚、排水、充水、性能测试和工厂运行期间的维护。