Nurol Huda Dahalan, Rahimi A. Rahman, Saffuan Wan Ahmad, Che Khairil Izam Che Ibrahim
{"title":"Public monitoring of environmental management plan implementation in road construction projects: key performance indicators","authors":"Nurol Huda Dahalan, Rahimi A. Rahman, Saffuan Wan Ahmad, Che Khairil Izam Che Ibrahim","doi":"10.1108/jedt-06-2023-0225","DOIUrl":null,"url":null,"abstract":"Purpose This study aims to examine the performance indicators (PIs) for assessing environmental management plan (EMP) implementation in road construction projects. The specific objectives are to compare the key PIs between environment auditors and environment officers and among project stakeholders, develop components to categorize interrelated key PIs and evaluate the effectiveness of interrelated key PIs and components. Design/methodology/approach Thirty-nine PIs were identified through a systematic literature review and in-depth interviews with environmental professionals. Subsequently, a questionnaire survey was designed based on this list of PIs and distributed to industry professionals. Sixty-one responses were collected in Malaysia and analyzed using the mean score ranking, normalization, agreement analysis, overlap analysis, factor analysis and fuzzy synthetic evaluation. Findings The analyses identified 18 key PIs: soil erosion, dust appearance, spill of chemical substance, construction waste, clogged drainage, overflowed silt trap, oil/fuel spills, changes in the colour of bodies of water, excessive cut and fill, vegetation depletion, changes in the colour of the runoff water, landslide occurrence, slope failures, irregular flood, public safety, deforestation, open burning and increased of schedule waste. Also, the key PIs can be grouped and ranked into the following four components: geological, pollution, environmental changes and ecological. Finally, the overall importance of the key PIs is between important and very important. Originality/value This study is a pioneer in quantitively examining the key PIs for EMP implementation in road construction projects. Researchers, industry practitioners and policymakers can use the findings to develop strategies and tools to allow public monitoring of EMP implementation.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":"54 1","pages":"0"},"PeriodicalIF":2.6000,"publicationDate":"2023-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jedt-06-2023-0225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose This study aims to examine the performance indicators (PIs) for assessing environmental management plan (EMP) implementation in road construction projects. The specific objectives are to compare the key PIs between environment auditors and environment officers and among project stakeholders, develop components to categorize interrelated key PIs and evaluate the effectiveness of interrelated key PIs and components. Design/methodology/approach Thirty-nine PIs were identified through a systematic literature review and in-depth interviews with environmental professionals. Subsequently, a questionnaire survey was designed based on this list of PIs and distributed to industry professionals. Sixty-one responses were collected in Malaysia and analyzed using the mean score ranking, normalization, agreement analysis, overlap analysis, factor analysis and fuzzy synthetic evaluation. Findings The analyses identified 18 key PIs: soil erosion, dust appearance, spill of chemical substance, construction waste, clogged drainage, overflowed silt trap, oil/fuel spills, changes in the colour of bodies of water, excessive cut and fill, vegetation depletion, changes in the colour of the runoff water, landslide occurrence, slope failures, irregular flood, public safety, deforestation, open burning and increased of schedule waste. Also, the key PIs can be grouped and ranked into the following four components: geological, pollution, environmental changes and ecological. Finally, the overall importance of the key PIs is between important and very important. Originality/value This study is a pioneer in quantitively examining the key PIs for EMP implementation in road construction projects. Researchers, industry practitioners and policymakers can use the findings to develop strategies and tools to allow public monitoring of EMP implementation.
期刊介绍:
- Design strategies - Usability and adaptability - Material, component and systems performance - Process control - Alternative and new technologies - Organizational, management and research issues - Human factors - Environmental, quality and health and safety issues - Cost and life cycle issues - Sustainability criteria, indicators, measurement and practices - Risk management - Entrepreneurship Law, regulation and governance - Design, implementing, managing and practicing innovation - Visualization, simulation, information and communication technologies - Education practices, innovation, strategies and policy issues.