The joint influence of quality assurance and postponement on a hybrid multi-item manufacturing-delivery decision-making

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2023-01-01 DOI:10.5267/j.ijiec.2023.6.002
Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu
{"title":"The joint influence of quality assurance and postponement on a hybrid multi-item manufacturing-delivery decision-making","authors":"Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu","doi":"10.5267/j.ijiec.2023.6.002","DOIUrl":null,"url":null,"abstract":"The present research explores the collective influence of quality assurance and postponement on a hybrid multiproduct replenishing-delivery decision-making. Assume the required multiproduct has a standard (common) component, and our replenishing-delivery model has incorporated a two-phase postponement strategy. The first phase makes all standard components and hires an external supplier to partially provide the required parts to cut short the needed uptime. In contrast, the second phase fabricates the finished multiproduct in sequence. To ensure the desired merchandise quality, we apply a quality-assurance action to the in-house processes to screen and remove scrap items and rework the repairable defects in both stages. Upon completing each merchandise, these products are transported to the customer in n fixed-quantity shipment in fixed-time intervals. We employ math modeling and formulating approaches to gain the overall supply-chain operating expenses comprising subcontracting, fabricating, stock holding, transportation, and customer holding costs. By minimizing system operating expenses, this research determines the optimal replenishing-delivery policy. Lastly, we give a numerical example to demonstrate our study’s applicability and usefulness/capability for facilitating managerial decision-making.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"206 1","pages":"0"},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2023.6.002","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

Abstract

The present research explores the collective influence of quality assurance and postponement on a hybrid multiproduct replenishing-delivery decision-making. Assume the required multiproduct has a standard (common) component, and our replenishing-delivery model has incorporated a two-phase postponement strategy. The first phase makes all standard components and hires an external supplier to partially provide the required parts to cut short the needed uptime. In contrast, the second phase fabricates the finished multiproduct in sequence. To ensure the desired merchandise quality, we apply a quality-assurance action to the in-house processes to screen and remove scrap items and rework the repairable defects in both stages. Upon completing each merchandise, these products are transported to the customer in n fixed-quantity shipment in fixed-time intervals. We employ math modeling and formulating approaches to gain the overall supply-chain operating expenses comprising subcontracting, fabricating, stock holding, transportation, and customer holding costs. By minimizing system operating expenses, this research determines the optimal replenishing-delivery policy. Lastly, we give a numerical example to demonstrate our study’s applicability and usefulness/capability for facilitating managerial decision-making.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
质量保证和延迟对混合多项目制造-交付决策的共同影响
本研究探讨了质量保证和延迟对混合多产品补充-交付决策的集体影响。假设所需的多产品有一个标准的(通用的)组件,并且我们的补充-交付模型包含了一个两阶段的延迟策略。第一阶段制作所有标准组件,并聘请外部供应商部分提供所需部件,以缩短所需的正常运行时间。相反,第二阶段按顺序制造成品。为了确保期望的商品质量,我们在内部流程中应用质量保证措施,筛选和移除废弃物品,并在两个阶段中对可修复的缺陷进行返工。在完成每件商品后,这些产品在固定的时间间隔内以固定数量的运输方式运送给客户。我们采用数学建模和制定方法来获得包括分包、制造、库存、运输和客户持有成本在内的整体供应链运营费用。通过最小化系统运行费用,确定了最优的补货配送策略。最后,我们给出了一个数值例子来证明我们的研究对促进管理决策的适用性和有用性/能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1