Analysis of Solar Power Plant Development Potential in Adipala - Cilacap

G-Tech Pub Date : 2023-10-02 DOI:10.33379/gtech.v7i4.2628
Fahmy Rinanda Saputri, Ricardo Linelson, Vincentius Rayza Lee
{"title":"Analysis of Solar Power Plant Development Potential in Adipala - Cilacap","authors":"Fahmy Rinanda Saputri, Ricardo Linelson, Vincentius Rayza Lee","doi":"10.33379/gtech.v7i4.2628","DOIUrl":null,"url":null,"abstract":"PT Pertamina (Persero) as the vanguard of the archipelago's energy has committed to finding and developing new and renewable energy sources to support national energy independence and sovereignty. One of the concrete steps taken by PT Pertamina through the Cilacap Processing Unit IV is to build a Solar Power Plant. One of the strategic solar power plant construction sites in an empty land area close to the 500 kV Adipala Sutet Power Network is located in Cilacap regency with an average global horizontal irradiation (GHI) value of 1908 kWh/m2. With this value, the installation of solar rooftops is the right solution to support electricity production using renewable energy. The electricity load consumption from the city in one year is 1785.6 KWh and is currently entirely supplied by PLN. In this study, a Solar Power Plant design was carried out on vacant land around housing that can be produced in one year. The design and calculations were carried out using the help of PVSyst and RETScreen software. From the simulation results, the results obtained are a Solar Power Plant that has been designed to produce 463 kWh per year which can meet 25.9% of electricity needs at the design site with a Solar Power Plant performance ratio of 85.74% where Solar Power Plant can produce electrical energy of 1531 KWh per year.","PeriodicalId":486638,"journal":{"name":"G-Tech","volume":"292 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"G-Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33379/gtech.v7i4.2628","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT Pertamina (Persero) as the vanguard of the archipelago's energy has committed to finding and developing new and renewable energy sources to support national energy independence and sovereignty. One of the concrete steps taken by PT Pertamina through the Cilacap Processing Unit IV is to build a Solar Power Plant. One of the strategic solar power plant construction sites in an empty land area close to the 500 kV Adipala Sutet Power Network is located in Cilacap regency with an average global horizontal irradiation (GHI) value of 1908 kWh/m2. With this value, the installation of solar rooftops is the right solution to support electricity production using renewable energy. The electricity load consumption from the city in one year is 1785.6 KWh and is currently entirely supplied by PLN. In this study, a Solar Power Plant design was carried out on vacant land around housing that can be produced in one year. The design and calculations were carried out using the help of PVSyst and RETScreen software. From the simulation results, the results obtained are a Solar Power Plant that has been designed to produce 463 kWh per year which can meet 25.9% of electricity needs at the design site with a Solar Power Plant performance ratio of 85.74% where Solar Power Plant can produce electrical energy of 1531 KWh per year.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Adipala - Cilacap太阳能电站发展潜力分析
PT Pertamina (Persero)作为群岛能源的先锋,致力于寻找和开发新的可再生能源,以支持国家能源独立和主权。PT Pertamina通过Cilacap第四处理单元采取的具体步骤之一是建立一个太阳能发电厂。在500千伏Adipala Sutet电网附近的空地上,有一个战略太阳能发电厂的建设地点位于Cilacap县,全球平均水平辐射(GHI)值为1908 kWh/m2。有了这个价值,安装太阳能屋顶是支持使用可再生能源发电的正确解决方案。全市一年用电负荷1785.6千瓦时,目前全部由PLN供电。在这项研究中,一个太阳能发电厂的设计是在房屋周围的空地上进行的,一年可以生产。利用PVSyst和RETScreen软件进行了设计和计算。由仿真结果可知,某太阳能电站设计发电量为463 kWh /年,可满足设计场地25.9%的用电需求,太阳能电站性能比为85.74%,太阳能电站年发电量为1531 kWh /年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis Perbandingan Metode Sinusoidal Pulse Width Modulation (SPWM) dan Kontrol Arus Ramp Comparison Current Control Pada Inverter Satu Fasa Klasterisasi Pola Kemiripan Harga Saham Menggunakan Metode Hirarki Analisa Penerapan K3 dengan Metode FMEA dan FTA pada PT. Sumber Alam Santoso Pratama Banyuwangi Upaya Pengendalian Kualitas Kadar Moishture Terigu Menggunakan Metode Failure Mode Effect Analysis dan Analisis Cost Of Poor Quality Pada PT. XYZ Manajemen Penggunaan Energi Baterai pada Mikrokontroler Berbasis Soft Latching Circuit
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1