A robust optimization model for demand response management with source-grid-load collaboration to consume wind-power

IF 1.9 Q4 ENERGY & FUELS Global Energy Interconnection Pub Date : 2023-12-01 DOI:10.1016/j.gloei.2023.11.007
Xiangfeng Zhou , Chunyuan Cai , Yongjian Li , Jiekang Wu , Yaoguo Zhan , Yehua Sun
{"title":"A robust optimization model for demand response management with source-grid-load collaboration to consume wind-power","authors":"Xiangfeng Zhou ,&nbsp;Chunyuan Cai ,&nbsp;Yongjian Li ,&nbsp;Jiekang Wu ,&nbsp;Yaoguo Zhan ,&nbsp;Yehua Sun","doi":"10.1016/j.gloei.2023.11.007","DOIUrl":null,"url":null,"abstract":"<div><p>To accommodate wind power as safely as possible and deal with the uncertainties of the output power of wind- driven generators, a min-max-min two-stage robust optimization model is presented, considering the unit commitment, source-network load collaboration, and control of the load demand response. After the constraint functions are linearized, the original problem is decomposed into the main problem and subproblem as a matrix using the strong dual method. The minimum-maximum of the original problem was continuously maximized using the iterative method, and the optimal solution was finally obtained. The constraint conditions expressed by the matrix may reduce the calculation time, and the upper and lower boundaries of the original problem may rapidly converge. The results of the example show that the injected nodes of the wind farms in the power grid should be selected appropriately; otherwise, it is easy to cause excessive accommodation of wind power at some nodes, leading to a surge in reserve costs and the load demand response is continuously optimized to reduce the inverse peak regulation characteristics of wind power. Thus, the most economical optimization scheme for the worst scenario of the output power of the generators is obtained, which proves the economy and reliability of the two-stage robust optimization method.</p></div>","PeriodicalId":36174,"journal":{"name":"Global Energy Interconnection","volume":"6 6","pages":"Pages 738-750"},"PeriodicalIF":1.9000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2096511723000981/pdf?md5=6eee09a2dce73fbc2e54e52d1f4f20b4&pid=1-s2.0-S2096511723000981-main.pdf","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Energy Interconnection","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2096511723000981","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

To accommodate wind power as safely as possible and deal with the uncertainties of the output power of wind- driven generators, a min-max-min two-stage robust optimization model is presented, considering the unit commitment, source-network load collaboration, and control of the load demand response. After the constraint functions are linearized, the original problem is decomposed into the main problem and subproblem as a matrix using the strong dual method. The minimum-maximum of the original problem was continuously maximized using the iterative method, and the optimal solution was finally obtained. The constraint conditions expressed by the matrix may reduce the calculation time, and the upper and lower boundaries of the original problem may rapidly converge. The results of the example show that the injected nodes of the wind farms in the power grid should be selected appropriately; otherwise, it is easy to cause excessive accommodation of wind power at some nodes, leading to a surge in reserve costs and the load demand response is continuously optimized to reduce the inverse peak regulation characteristics of wind power. Thus, the most economical optimization scheme for the worst scenario of the output power of the generators is obtained, which proves the economy and reliability of the two-stage robust optimization method.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用源-网-荷协作消耗风能的需求响应管理稳健优化模型
为了尽可能安全地适应风力发电,并处理风力发电机输出功率的不确定性,本文提出了一个最小-最大-最小两阶段鲁棒优化模型,考虑了机组承诺、源网负荷协作和负荷需求响应控制。在对约束函数进行线性化处理后,利用强对偶法将原问题分解为主问题和子问题矩阵。利用迭代法不断求原问题的最小值-最大值,最终得到最优解。矩阵表示的约束条件可以减少计算时间,原问题的上下限可以快速收敛。实例结果表明,应合理选择风电场在电网中的注入节点,否则容易造成部分节点对风电的过度接纳,导致储备成本激增,并不断优化负荷需求响应,降低风电的逆调峰特性。因此,得到了发电机输出功率最坏情况下最经济的优化方案,证明了两阶段鲁棒优化方法的经济性和可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Global Energy Interconnection
Global Energy Interconnection Engineering-Automotive Engineering
CiteScore
5.70
自引率
0.00%
发文量
985
审稿时长
15 weeks
期刊最新文献
Enhancing photovoltaic power prediction using a CNN-LSTM-attention hybrid model with Bayesian hyperparameter optimization Adaptive VSG control of flywheel energy storage array for frequency support in microgrids Adaptive linear active disturbance-rejection control strategy reduces the impulse current of compressed air energy storage connected to the grid Optimization dispatching strategy for an energy storage system considering its unused capacity sharing Optimal scheduling of zero-carbon park considering variational characteristics of hydrogen energy storage systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1