USE OF THE CDE ENVIRONMENT IN TEAM COLLABORATION IN BIM

Andrzej Szymon Borkowski, Jakub Brożyna, Joanna Litwin, Weronika Rączka, Aleksandra Szporanowicz
{"title":"USE OF THE CDE ENVIRONMENT IN TEAM COLLABORATION IN BIM","authors":"Andrzej Szymon Borkowski, Jakub Brożyna, Joanna Litwin, Weronika Rączka, Aleksandra Szporanowicz","doi":"10.35784/iapgos.4261","DOIUrl":null,"url":null,"abstract":"In project processes, group collaboration and project documentation management are important aspects. In order for the cooperation of all project participants to be effective, it should be based first and foremost on adequate and effective communication. All project participants should use such solutions so that they can exchange, manage and combine information quickly and efficiently throughout the entire investment process, thus providing a complete picture of the situation. To this end, it is necessary to develop a catalogue of good practices supported by a variety of examples, as well as rules for group cooperation when using a CDE-type solution. The aim of this article was to show the advantages and benefits as well as the disadvantages and limitations in group collaboration when working on a single BIM model.","PeriodicalId":504633,"journal":{"name":"Informatyka, Automatyka, Pomiary w Gospodarce i Ochronie Środowiska","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Informatyka, Automatyka, Pomiary w Gospodarce i Ochronie Środowiska","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35784/iapgos.4261","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In project processes, group collaboration and project documentation management are important aspects. In order for the cooperation of all project participants to be effective, it should be based first and foremost on adequate and effective communication. All project participants should use such solutions so that they can exchange, manage and combine information quickly and efficiently throughout the entire investment process, thus providing a complete picture of the situation. To this end, it is necessary to develop a catalogue of good practices supported by a variety of examples, as well as rules for group cooperation when using a CDE-type solution. The aim of this article was to show the advantages and benefits as well as the disadvantages and limitations in group collaboration when working on a single BIM model.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在 BIM 的团队协作中使用 CDE 环境
在项目过程中,小组合作和项目文件管理是重要的方面。要使所有项目参与者的合作有效,首先应建立在充分和有效沟通的基础上。所有项目参与者都应使用此类解决方案,以便在整个投资过程中快速有效地交换、管理和合并信息,从而提供完整的情况。为此,有必要制定一份由各种实例支持的良好做法目录,以及在使用 CDE 型解决方案时的小组合作规则。本文的目的是展示在单个 BIM 模型上进行小组合作时的优势和好处,以及劣势和局限性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A COMPREHENSIVE STUDY: INTRACRANIAL ANEURYSM DETECTION VIA VGG16-DENSENET HYBRID DEEP LEARNING ON DSA IMAGES OPTICAL SPECKLE-FIELD VISIBILITY DIMINISHING BY REDUCTION OF A TEMPORAL COHERENCE TENSOR AND VECTOR APPROACHES TO OBJECTS RECOGNITION BY INVERSE FEATURE FILTERS METODA OBLICZANIA WSKAŹNIKA BEZPIECZEŃSTWA INFORMACJI W MEDIACH SPOŁECZNOŚCIOWYCH Z UWZGLĘDNIENIEM DŁUGOŚCI ŚCIEŻKI MIĘDZY KLIENTAMI INTELLIGENT DATA ANALYSIS ON AN ANALYTICAL PLATFORM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1