#BaghjanBurns: Crisis at Oil India Ltd

Asha Kaul, Vidhi Chaudhri
{"title":"#BaghjanBurns: Crisis at Oil India Ltd","authors":"Asha Kaul, Vidhi Chaudhri","doi":"10.1108/case.iima.2023.000047","DOIUrl":null,"url":null,"abstract":"On May 27, 2020, a blowout occurred in Well No. 5 at Baghjan (Assam); the well, owned by Oil India Ltd., caught fire on June 9, 2020. For almost five and a half months, the company tried to douse the 200-foot high flame but failed to do so. Finally, on Day 173, Oil India Ltd succeeded in capping the well. Biswajit Roy, Director (Human Resources and Business Development), was tasked with investigating the nature and cause of the crisis. Roy pondered on the nature of the crisis: Had it been purely technical or stakeholder-induced? What had led to the chaotic condition? Could things have been done differently?","PeriodicalId":433867,"journal":{"name":"Indian Institute of Management Ahmedabad","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indian Institute of Management Ahmedabad","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/case.iima.2023.000047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

On May 27, 2020, a blowout occurred in Well No. 5 at Baghjan (Assam); the well, owned by Oil India Ltd., caught fire on June 9, 2020. For almost five and a half months, the company tried to douse the 200-foot high flame but failed to do so. Finally, on Day 173, Oil India Ltd succeeded in capping the well. Biswajit Roy, Director (Human Resources and Business Development), was tasked with investigating the nature and cause of the crisis. Roy pondered on the nature of the crisis: Had it been purely technical or stakeholder-induced? What had led to the chaotic condition? Could things have been done differently?
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
#BaghjanBurns:印度石油公司的危机
2020 年 5 月 27 日,位于阿萨姆邦 Baghjan 的 5 号油井发生井喷;2020 年 6 月 9 日,印度石油有限公司拥有的这口油井起火。在将近五个半月的时间里,该公司试图扑灭 200 英尺高的火焰,但未能成功。最终,在第 173 天,印度石油有限公司成功封堵了油井。人力资源和业务发展总监比斯瓦吉特-罗伊负责调查危机的性质和原因。罗伊对危机的性质进行了思考:危机是纯技术性的还是利益相关者引起的?是什么导致了混乱的局面?是否可以采取不同的方法?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
TEGA Industries Ltd: Journey of an Indian MNC (Part A) ReNew Power: Building Scale in the Indian RE Sector Jarsh Safety's Air-Conditioned Helmets: Opportunities for Productivity Enhancement Schematic Software Company: Accelerating Growth Should Indian Railways Reform, Collaborate and Perform with Startups?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1