Comparing time and cost performance of DBB and DB public construction projects in Kuwait

IF 2.2 4区 工程技术 Q3 ENGINEERING, MULTIDISCIPLINARY Journal of Engineering Research Pub Date : 2024-12-01 DOI:10.1016/j.jer.2023.11.016
Sarah Soud Salem Al-enezi, Ruqaya Al Sabah
{"title":"Comparing time and cost performance of DBB and DB public construction projects in Kuwait","authors":"Sarah Soud Salem Al-enezi,&nbsp;Ruqaya Al Sabah","doi":"10.1016/j.jer.2023.11.016","DOIUrl":null,"url":null,"abstract":"<div><div>Kuwait is an enormous construction site as many vital public projects are under construction or in preparatory stages to achieve the vision of a New Kuwait by 2035. However, the new Public Tenders Law No. 49 of 2016 authorized the sole operation of the Design-Bid-Build (DBB) method as the delivery system method, preventing the employment of Design-Build (DB). Hence, this research undertook a comparative analysis of cost and time performance of DBB and DB public construction projects in Kuwait for the first time, marking the originality of this study. Moreover, 160 projects were collected from four government entities. Then, the total collected projects were categorized based on contract types and project sizes depending on contract cost. This research has recognized that DB has superior performance compared to DBB regarding cost growth for all collected projects, both contract types, projects of less than 300,000 KD, and projects between 300,000 and 12 million KD. No statistically significant differences between DBB and DB projects regarding schedule growth were found for all collected projects, both contract types and project sizes. Furthermore, the findings indicated that the DBB projects’ construction intensity was faster than that of DB projects with a value between 300,00 KD and 12 million KD. For projects that had a value of more than 12 million KD, the DB projects’ construction intensity was faster than that of DBB projects. Hence, it is concluded that the issue is not with the DB delivery systems themselves, but rather with the deployment of these systems.</div></div>","PeriodicalId":48803,"journal":{"name":"Journal of Engineering Research","volume":"12 4","pages":"Pages 680-690"},"PeriodicalIF":2.2000,"publicationDate":"2024-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Research","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2307187723003218","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Kuwait is an enormous construction site as many vital public projects are under construction or in preparatory stages to achieve the vision of a New Kuwait by 2035. However, the new Public Tenders Law No. 49 of 2016 authorized the sole operation of the Design-Bid-Build (DBB) method as the delivery system method, preventing the employment of Design-Build (DB). Hence, this research undertook a comparative analysis of cost and time performance of DBB and DB public construction projects in Kuwait for the first time, marking the originality of this study. Moreover, 160 projects were collected from four government entities. Then, the total collected projects were categorized based on contract types and project sizes depending on contract cost. This research has recognized that DB has superior performance compared to DBB regarding cost growth for all collected projects, both contract types, projects of less than 300,000 KD, and projects between 300,000 and 12 million KD. No statistically significant differences between DBB and DB projects regarding schedule growth were found for all collected projects, both contract types and project sizes. Furthermore, the findings indicated that the DBB projects’ construction intensity was faster than that of DB projects with a value between 300,00 KD and 12 million KD. For projects that had a value of more than 12 million KD, the DB projects’ construction intensity was faster than that of DBB projects. Hence, it is concluded that the issue is not with the DB delivery systems themselves, but rather with the deployment of these systems.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
比较科威特 DBB 和 DB 公共建筑项目的时间和成本绩效
科威特是一个巨大的建筑工地,许多重要的公共项目正在建设中或处于筹备阶段,以实现到2035年新科威特的愿景。然而,2016年第49号新的《公开招标法》授权设计-投标-建造(DBB)方法作为交付系统方法的唯一操作,禁止使用设计-建造(DB)方法。因此,本研究首次对科威特DBB和DB公共建设项目的成本和时间绩效进行了比较分析,标志着本研究的独创性。此外,从四个政府实体收集了160个项目。然后,根据合同类型和合同成本的项目规模对收集的项目总数进行分类。这项研究已经认识到,在所有收集到的项目中,无论是合同类型、少于300,000 KD的项目,还是300,000 - 1,200万KD之间的项目,DB在成本增长方面都比DBB有更好的表现。在所有收集的项目中,无论是合同类型还是项目规模,DBB和DB项目在进度增长方面没有统计学上的显著差异。此外,研究结果表明,DBB项目的建设强度在30万~ 1200万KD之间,高于DB项目的建设强度。对于价值在1200万KD以上的项目,DB项目的建设强度要快于DBB项目。因此,可以得出结论,问题不在于DB交付系统本身,而在于这些系统的部署。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Engineering Research
Journal of Engineering Research ENGINEERING, MULTIDISCIPLINARY-
CiteScore
1.60
自引率
10.00%
发文量
181
审稿时长
20 weeks
期刊介绍: Journal of Engineering Research (JER) is a international, peer reviewed journal which publishes full length original research papers, reviews, case studies related to all areas of Engineering such as: Civil, Mechanical, Industrial, Electrical, Computer, Chemical, Petroleum, Aerospace, Architectural, Biomedical, Coastal, Environmental, Marine & Ocean, Metallurgical & Materials, software, Surveying, Systems and Manufacturing Engineering. In particular, JER focuses on innovative approaches and methods that contribute to solving the environmental and manufacturing problems, which exist primarily in the Arabian Gulf region and the Middle East countries. Kuwait University used to publish the Journal "Kuwait Journal of Science and Engineering" (ISSN: 1024-8684), which included Science and Engineering articles since 1974. In 2011 the decision was taken to split KJSE into two independent Journals - "Journal of Engineering Research "(JER) and "Kuwait Journal of Science" (KJS).
期刊最新文献
Subcritical water extraction on phenolic, flavonoid and antioxidant activity from Orthosiphon Stamineus leaves: Experimental and optimization Statistical analysis and optimization of mechanical-chemical electro-Fenton for organic contaminant degradation in refinery wastewater Prediction of solar radiation as a function of particulate matter pollution and meteorological data using machine learning models Enhanced paracetamol removal using PES/GO mixed matrix membranes: A study on synthesis, characterization, and performance evaluation In vitro study of the antihemolytic and antioxidant potential of two essential oils from Salvia officinalis L. and Curcuma longa L. against glucantime® toxicity
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1