Performance of Pile Group Affected by Adjacent Excavations in Sand below the Water Table

Mohamed G. I. Shaaban, Mostafa Abd El-Naiem, Abdel-Aziz Senoon, M. Kenawi
{"title":"Performance of Pile Group Affected by Adjacent Excavations in Sand below the Water Table","authors":"Mohamed G. I. Shaaban, Mostafa Abd El-Naiem, Abdel-Aziz Senoon, M. Kenawi","doi":"10.21608/sej.2024.259268.1050","DOIUrl":null,"url":null,"abstract":"Numerical analysis is conducted to investigate the settlement and tilting behavior of a group of piles adjacent to an excavation in saturated sand by using PLAXIS 3D finite element software. Moreover, the analysis aims to gain a better understanding of the load transfer mechanisms of the piled foundations due to an adjacent excavation. The influences of excavation depth, pile group location from excavation, initial working load, supporting system stiffness, and stiffness of piles and cap are investigated. As excavation proceeds, settlement and tilting of the adjacent buildings can be observed at different stages of excavation. The pile group settles to its maximum amount when the rear piles are in the position of maximum greenfield ground surface settlement. The settlement of the pile group can be significantly reduced by increasing the supporting system stiffness and decreasing the pile cap's applied load. The pile group settlement due to the excavation increases from 2.99 to 3.80% of the pile diameter when the ratio of applied load to ultimate load-carrying capacity of the pile group increases from 0.25 to 0.5. A clearly noticeable tilting can be observed when the pile group is located near the excavation. By increasing the pile cap's applied load and supporting system stiffness, the pile group tilting decreases. The settlement and tilting of the pile group are almost insensitive to the modulus of elasticity of the concrete piles and the cap. Loads are transferred between the toe and the shaft of the piles at different excavation stages.","PeriodicalId":34550,"journal":{"name":"Sohag Engineering Journal","volume":"15 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sohag Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21608/sej.2024.259268.1050","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Numerical analysis is conducted to investigate the settlement and tilting behavior of a group of piles adjacent to an excavation in saturated sand by using PLAXIS 3D finite element software. Moreover, the analysis aims to gain a better understanding of the load transfer mechanisms of the piled foundations due to an adjacent excavation. The influences of excavation depth, pile group location from excavation, initial working load, supporting system stiffness, and stiffness of piles and cap are investigated. As excavation proceeds, settlement and tilting of the adjacent buildings can be observed at different stages of excavation. The pile group settles to its maximum amount when the rear piles are in the position of maximum greenfield ground surface settlement. The settlement of the pile group can be significantly reduced by increasing the supporting system stiffness and decreasing the pile cap's applied load. The pile group settlement due to the excavation increases from 2.99 to 3.80% of the pile diameter when the ratio of applied load to ultimate load-carrying capacity of the pile group increases from 0.25 to 0.5. A clearly noticeable tilting can be observed when the pile group is located near the excavation. By increasing the pile cap's applied load and supporting system stiffness, the pile group tilting decreases. The settlement and tilting of the pile group are almost insensitive to the modulus of elasticity of the concrete piles and the cap. Loads are transferred between the toe and the shaft of the piles at different excavation stages.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
受地下水位以下砂层中相邻挖掘工程影响的桩群性能
利用 PLAXIS 3D 有限元软件进行了数值分析,以研究饱和砂土中邻近开挖的一组桩基的沉降和倾斜行为。此外,该分析旨在更好地了解相邻开挖造成的桩基荷载传递机制。分析研究了开挖深度、开挖桩群位置、初始工作荷载、支撑系统刚度以及桩和桩帽刚度的影响。随着开挖的进行,在开挖的不同阶段可以观察到邻近建筑物的沉降和倾斜。当后桩处于绿地地表最大沉降位置时,桩群的沉降量最大。通过增加支撑系统的刚度和减小桩帽的外加荷载,可显著减少桩群的沉降。当施加荷载与桩群极限承载力之比从 0.25 增加到 0.5 时,开挖造成的桩群沉降量从桩径的 2.99% 增加到 3.80%。当桩群位于开挖层附近时,可观察到明显的倾斜。通过增加桩帽的外加荷载和支撑系统刚度,桩群的倾斜会减小。桩群的沉降和倾斜对混凝土桩和桩帽的弹性模量几乎不敏感。在不同的开挖阶段,荷载会在桩趾和桩轴之间传递。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
11
审稿时长
5 weeks
期刊最新文献
Analysis, Performance Improvement and Control Design of Heliostat System Based on Fractional Order PID Controller Towards identifying mosque architectural characteristics aligned with expert preferences: application on selected mosques in Assuit City, Egypt Environmental Impact Assessment of Composition Wall Materials Alternatives Ibny Baitak as a Case Study Performance of Pile Group Affected by Adjacent Excavations in Sand below the Water Table Integrating Digital Techniques/ Technologies in Developing Egyptian Museums (Case Study: Alexandria Library Museums - Alexandria City)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1