Short circuit analysis of a fault-tolerant current-limiting high temperature superconducting transformer in a power system in presence of distributed generations

IF 5.6 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC Superconductivity Pub Date : 2024-02-03 DOI:10.1016/j.supcon.2024.100085
Alireza Sadeghi, Shahin Alipour Bonab, Wenjuan Song, Mohammad Yazdani-Asrami
{"title":"Short circuit analysis of a fault-tolerant current-limiting high temperature superconducting transformer in a power system in presence of distributed generations","authors":"Alireza Sadeghi,&nbsp;Shahin Alipour Bonab,&nbsp;Wenjuan Song,&nbsp;Mohammad Yazdani-Asrami","doi":"10.1016/j.supcon.2024.100085","DOIUrl":null,"url":null,"abstract":"<div><p>Power transformers are key elements for the safe and reliable delivery of electrical energy generated by renewable energy resources to consumers via transmission lines. Fault-tolerant current-limiting High Temperature Superconducting (FTCL HTS) transformers are type of superconducting transformers that tolerate fault for seconds and limit the fault current without the threat of burnout or delamination of tapes and deformation of windings. In this paper, the fault performance of a FTCL HTS transformer in a standard IEEE power system is investigated. The studied transformer is a 50 MVA 132 kV/13.8 kV transformer where both windings are made up of HTS tapes. The understudied power system consists of two microgrids with distributed generators. Part of the power in microgrids is supplied by the upstream grid which is connected to the microgrids through the HTS transformers. Two fault scenarios have been considered in this power system, in each one of these scenarios, a fault happens in one of the microgrids. Two considered fault scenarios have an approximate fault current of 18x to 23x of the rated current in the secondary windings. Results showed that insulated windings in FTCL HTS transformers could substantially reduce the peak temperature of the HTS windings, compared to bare windings. Afterwards, post-fault loading is imposed on the HTS windings, to observe their performance against the current increase after fault clearance. In this case, for the first scenario of the faults, the FTCL HTS transformer could tolerate 192% of post-fault overloading, while this number for the second fault scenario is 170%. Finally, the impact of post-fault loading on the full recovery time was discussed.</p></div>","PeriodicalId":101185,"journal":{"name":"Superconductivity","volume":"9 ","pages":"Article 100085"},"PeriodicalIF":5.6000,"publicationDate":"2024-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2772830724000024/pdfft?md5=0739bbd85ac438df78e7d50904a2bc05&pid=1-s2.0-S2772830724000024-main.pdf","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Superconductivity","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2772830724000024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

Power transformers are key elements for the safe and reliable delivery of electrical energy generated by renewable energy resources to consumers via transmission lines. Fault-tolerant current-limiting High Temperature Superconducting (FTCL HTS) transformers are type of superconducting transformers that tolerate fault for seconds and limit the fault current without the threat of burnout or delamination of tapes and deformation of windings. In this paper, the fault performance of a FTCL HTS transformer in a standard IEEE power system is investigated. The studied transformer is a 50 MVA 132 kV/13.8 kV transformer where both windings are made up of HTS tapes. The understudied power system consists of two microgrids with distributed generators. Part of the power in microgrids is supplied by the upstream grid which is connected to the microgrids through the HTS transformers. Two fault scenarios have been considered in this power system, in each one of these scenarios, a fault happens in one of the microgrids. Two considered fault scenarios have an approximate fault current of 18x to 23x of the rated current in the secondary windings. Results showed that insulated windings in FTCL HTS transformers could substantially reduce the peak temperature of the HTS windings, compared to bare windings. Afterwards, post-fault loading is imposed on the HTS windings, to observe their performance against the current increase after fault clearance. In this case, for the first scenario of the faults, the FTCL HTS transformer could tolerate 192% of post-fault overloading, while this number for the second fault scenario is 170%. Finally, the impact of post-fault loading on the full recovery time was discussed.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
存在分布式发电的电力系统中容错限流高温超导变压器的短路分析
电力变压器是将可再生能源产生的电能通过输电线路安全可靠地输送给用户的关键元件。容错限流高温超导(FTCL HTS)变压器是一种超导变压器,可在几秒钟内容错并限制故障电流,而不会造成磁带烧毁或分层以及绕组变形的威胁。本文研究了标准 IEEE 电力系统中 FTCL HTS 变压器的故障性能。所研究的变压器为 50 MVA 132 kV/13.8 kV 变压器,两个绕组均由 HTS 磁带组成。未充分研究的电力系统由两个带有分布式发电机的微电网组成。微电网的部分电力由上游电网提供,上游电网通过 HTS 变压器与微电网相连。该电力系统考虑了两种故障情况,在每种情况下,其中一个微电网都会发生故障。两种故障情况下,二次绕组的故障电流大约为额定电流的 18 至 23 倍。结果表明,与裸绕组相比,FTCL HTS 变压器中的绝缘绕组可大幅降低 HTS 绕组的峰值温度。随后,对 HTS 绕组施加故障后负载,以观察其在故障排除后电流增加时的性能。在这种情况下,对于第一种故障情况,FTCL HTS 变压器可承受 192% 的故障后过载,而对于第二种故障情况,这一数字为 170%。最后,讨论了故障后负载对完全恢复时间的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.90
自引率
0.00%
发文量
0
期刊最新文献
Design and initial test results of a space-bound flux pump to energize the Hēki mission’s superconducting magnet Recent progress in high-temperature superconducting undulators Thickness dependence of the second magnetization peak effect in Ba0.6K0.4Fe2As2 single crystals Development and construction of magnet system for world’s first full high temperature superconducting tokamak The Chinese magneto-biased superconducting current limiter has achieved long-term grid-connected demonstration, withstanding transmission line fault
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1