Decision Analysis to Find Best Solution of Operation and Maintenance Management System in Central Processing Plant (CPP) Gundih Using The SMART Method at PT. Pertamina EP
{"title":"Decision Analysis to Find Best Solution of Operation and Maintenance Management System in Central Processing Plant (CPP) Gundih Using The SMART Method at PT. Pertamina EP","authors":"A. Z. Abidin, Santi Novani","doi":"10.47191/ijcsrr/v7-i2-22","DOIUrl":null,"url":null,"abstract":"Central Processing Plant (CPP) Gundih is a gas field owned by PT. Pertamina EP Cepu Field area which is located in Blora Regency, Central Java. The gas produced by the CPP Gundih is channelled to the Tambak Lorok Gas and Steam Power Plant (PLTGU) with a capacity of 1,469MW in the Semarang City area, Central Java. Therefore, the CPP Gundih is a vital national object that supports national energy security, especially for the Central Java area. CPP Gundih first operated in 2013 with the operation and maintenance management system being fully handled by a third party with a contract term of one decade. In the coming year, the contract system will approach the end of the collaboration so that PT. Pertamina EP needs more efficient management schemes and strategies and more agile business processes. In the past decade, there have been several evaluations that have become a concern for companies in implementing contract systems with third parties. These obstacles mean that several aspects are not managed well and result in problems that reduce the level of customer satisfaction, decrease profits, and increase operational and maintenance costs. So that PT. Pertamina EP is considering several options for better management of the CPP Gundih in the future, namely the option of detailing third party contracts in the future, the option of transferring management by PT. Pertamina EP partially, full management transfer option by PT. Pertamina EP without any third-party involvement. From several proposed options, the author will use the Simple Multi Attribute Rating Technique (SMART) method to select the best option by considering aspects of Cost, Durability and Plant Availability, Manpower Competency Management, Remuneration, Communication Flow, and Integrated Work Procedure. The research results obtained from this method will become a reference for the PT management team. Pertamina EP for decision making related to the operation and maintenance implementation system at the Central Processing Plant (CPP) Gundih gas field.","PeriodicalId":503135,"journal":{"name":"International Journal of Current Science Research and Review","volume":"71 S5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Current Science Research and Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47191/ijcsrr/v7-i2-22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Central Processing Plant (CPP) Gundih is a gas field owned by PT. Pertamina EP Cepu Field area which is located in Blora Regency, Central Java. The gas produced by the CPP Gundih is channelled to the Tambak Lorok Gas and Steam Power Plant (PLTGU) with a capacity of 1,469MW in the Semarang City area, Central Java. Therefore, the CPP Gundih is a vital national object that supports national energy security, especially for the Central Java area. CPP Gundih first operated in 2013 with the operation and maintenance management system being fully handled by a third party with a contract term of one decade. In the coming year, the contract system will approach the end of the collaboration so that PT. Pertamina EP needs more efficient management schemes and strategies and more agile business processes. In the past decade, there have been several evaluations that have become a concern for companies in implementing contract systems with third parties. These obstacles mean that several aspects are not managed well and result in problems that reduce the level of customer satisfaction, decrease profits, and increase operational and maintenance costs. So that PT. Pertamina EP is considering several options for better management of the CPP Gundih in the future, namely the option of detailing third party contracts in the future, the option of transferring management by PT. Pertamina EP partially, full management transfer option by PT. Pertamina EP without any third-party involvement. From several proposed options, the author will use the Simple Multi Attribute Rating Technique (SMART) method to select the best option by considering aspects of Cost, Durability and Plant Availability, Manpower Competency Management, Remuneration, Communication Flow, and Integrated Work Procedure. The research results obtained from this method will become a reference for the PT management team. Pertamina EP for decision making related to the operation and maintenance implementation system at the Central Processing Plant (CPP) Gundih gas field.
Gundih 中央加工厂(CPP)是 PT.该气田位于中爪哇的 Blora 县。Gundih 中央处理厂生产的天然气被输送到位于中爪哇三宝垄市的 Tambak Lorok 天然气和蒸汽发电厂 (PLTGU),该发电厂的发电能力为 1,469 兆瓦。因此,CPP Gundih 是支持国家能源安全,尤其是中爪哇地区能源安全的重要国家目标。CPP Gundih 于 2013 年首次运营,运营和维护管理系统完全由第三方负责,合同期为十年。来年,合同系统将接近合作期满,PT.Pertamina EP 需要更高效的管理计划和战略,以及更灵活的业务流程。在过去的十年中,有几项评估已成为公司在与第三方实施合同系统时所关注的问题。这些障碍意味着有几个方面没有得到很好的管理,导致客户满意度降低、利润减少、运营和维护成本增加等问题。因此,PT.Pertamina EP 正在考虑未来更好地管理 CPP Gundih 的几种方案,即未来细化第三方合同的方案、PT.Pertamina EP 部分移交管理的方案、PT.Pertamina EP 部分移交管理的方案、PT.Pertamina EP 部分移交管理的方案、Pertamina EP 部分移交管理的方案。Pertamina EP 部分移交管理权的方案、PT.Pertamina EP 没有任何第三方的参与。作者将采用简单多属性评级技术(SMART)方法,从成本、耐久性和工厂可用性、人力能力管理、薪酬、沟通流程和综合工作程序等方面考虑,从多个建议方案中选出最佳方案。该方法的研究成果将为 PT 管理团队提供参考。Pertamina EP 公司将就 Gundih 气田中央处理厂(CPP)的运营和维护实施系统进行决策。