{"title":"Optimal position and distribution mode for on-site hydrogen electrolyzers in onshore wind farms for a minimal levelized cost of hydrogen (LCoH)","authors":"Thorsten Reichartz, Georg Jacobs, Tom Rathmes, Lucas Blickwedel, R. Schelenz","doi":"10.5194/wes-9-281-2024","DOIUrl":null,"url":null,"abstract":"Abstract. Storing energy is a major challenge in achieving a 100 % renewable energy system. One promising approach is the production of green hydrogen from wind power. This work proposes a method for optimizing the design of wind–hydrogen systems for existing onshore wind farms in order to achieve the lowest possible levelized cost of hydrogen (LCoH). This is done by the application of a novel Python-based optimization model that iteratively determines the optimal electrolyzer position and distribution mode of hydrogen for given wind farm layouts. The model includes the costs of all required infrastructure components. It considers peripheral factors such as existing and new roads, necessary power cables and pipelines, wage and fuel costs for truck transportation, and the distance to the point of demand (POD). Based on the results, a decision can be made whether to distribute the hydrogen to the POD by truck or pipeline. For a 23.4 MW onshore wind farm in Germany, a minimal LCoH of EUR 4.58 kgH2-1 at an annual hydrogen production of 241.4 tH2a-1 is computed. These results are significantly affected by the position of the electrolyzer, the distribution mode, varying wind farm and electrolyzer sizes, and the distance to the POD. The influence of the ratio of electrolyzer power to wind farm power is also investigated. The ideal ratio between the rated power of the electrolyzer and the wind farm lies at around 10 %, with a resulting capacity factor of 78 % for the given case. The new model can be used by system planners and researchers to improve and accelerate the planning process for wind–hydrogen systems. Additionally, the economic efficiency, hence competitiveness, of wind–hydrogen systems is increased, which contributes to an urgently needed accelerated expansion of electrolyzers. The results of the influencing parameters on the LCoH will help to set development goals and indicate a path towards a cost-competitive green wind–hydrogen system.\n","PeriodicalId":509667,"journal":{"name":"Wind Energy Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Wind Energy Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5194/wes-9-281-2024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. Storing energy is a major challenge in achieving a 100 % renewable energy system. One promising approach is the production of green hydrogen from wind power. This work proposes a method for optimizing the design of wind–hydrogen systems for existing onshore wind farms in order to achieve the lowest possible levelized cost of hydrogen (LCoH). This is done by the application of a novel Python-based optimization model that iteratively determines the optimal electrolyzer position and distribution mode of hydrogen for given wind farm layouts. The model includes the costs of all required infrastructure components. It considers peripheral factors such as existing and new roads, necessary power cables and pipelines, wage and fuel costs for truck transportation, and the distance to the point of demand (POD). Based on the results, a decision can be made whether to distribute the hydrogen to the POD by truck or pipeline. For a 23.4 MW onshore wind farm in Germany, a minimal LCoH of EUR 4.58 kgH2-1 at an annual hydrogen production of 241.4 tH2a-1 is computed. These results are significantly affected by the position of the electrolyzer, the distribution mode, varying wind farm and electrolyzer sizes, and the distance to the POD. The influence of the ratio of electrolyzer power to wind farm power is also investigated. The ideal ratio between the rated power of the electrolyzer and the wind farm lies at around 10 %, with a resulting capacity factor of 78 % for the given case. The new model can be used by system planners and researchers to improve and accelerate the planning process for wind–hydrogen systems. Additionally, the economic efficiency, hence competitiveness, of wind–hydrogen systems is increased, which contributes to an urgently needed accelerated expansion of electrolyzers. The results of the influencing parameters on the LCoH will help to set development goals and indicate a path towards a cost-competitive green wind–hydrogen system.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
陆上风电场现场电解氢器的最佳位置和分配模式,以实现最低氢气平准化成本 (LCoH)
摘要能源储存是实现 100% 可再生能源系统的一大挑战。利用风能生产绿色氢气是一种很有前景的方法。本研究提出了一种方法,用于优化现有陆上风电场的风力制氢系统设计,以实现尽可能低的氢气平准化成本 (LCoH)。这是通过应用一种基于 Python 的新型优化模型来实现的,该模型可针对给定的风电场布局迭代确定最佳电解槽位置和氢气分配模式。该模型包括所有所需基础设施组件的成本。它考虑了周边因素,如现有和新建道路、必要的电力电缆和管道、卡车运输的工资和燃料成本以及到需求点 (POD) 的距离。根据计算结果,可以决定是通过卡车还是管道将氢气输送到 POD。对于德国一个 23.4 兆瓦的陆上风电场,在年氢气产量为 241.4 tH2a-1 的情况下,计算出的最低 LCoH 为 4.58 欧元 kgH2-1。这些结果受到电解槽位置、配电模式、不同风电场和电解槽大小以及与 POD 距离的明显影响。此外,还研究了电解槽功率与风电场功率之比的影响。理想的电解槽额定功率与风电场功率之比约为 10%,因此给定情况下的容量因子为 78%。系统规划人员和研究人员可利用新模型来改进和加快风力-氢能系统的规划过程。此外,还能提高风力制氢系统的经济效益和竞争力,从而促进急需的电解槽的加速扩展。影响 LCoH 参数的结果将有助于制定发展目标,并指明一条通往具有成本竞争力的绿色风力制氢系统的道路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
On the importance of wind predictions in wake steering optimization On the power and control of a misaligned rotor – beyond the cosine law Identification of electro-mechanical interactions in wind turbines Hyperparameter tuning framework for calibrating analytical wake models using SCADA data of an offshore wind farm Synchronised WindScanner field measurements of the induction zone between two closely spaced wind turbines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1