Opportunities and Challenges of Advanced Testing Approaches for Multi-Megawatt Wind Turbines

IF 5 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC IEEE open journal of power electronics Pub Date : 2024-02-12 DOI:10.1109/OJPEL.2024.3364973
Florian Hans;Philipp Borowski;Jan Wendt;Gesa Quistorf;Torben Jersch
{"title":"Opportunities and Challenges of Advanced Testing Approaches for Multi-Megawatt Wind Turbines","authors":"Florian Hans;Philipp Borowski;Jan Wendt;Gesa Quistorf;Torben Jersch","doi":"10.1109/OJPEL.2024.3364973","DOIUrl":null,"url":null,"abstract":"To safely integrate large numbers of wind turbines into the electric power grid, turbines must demonstrate compliance with grid codes and technical guidelines through rigorous testing. Such tests are traditionally performed using prototype turbines on designated measurement sites. So-called field tests offer little flexibility and repeatability, as factors such as wind and grid conditions cannot be adjusted at will. Recently, specialized laboratory test facilities were established to augment or completely replace conventional field tests. These facilities need to constantly grow in size, power, and functionality to keep up with wind turbine trends, while new and increasingly complex grid requirements necessitate more advanced testing methodologies. This paper presents four testing concepts and how they can be further integrated into the development and certification process of wind turbines using the laboratories of Fraunhofer IWES as an example. In particular, turbine, nacelle, subsystem, and component testing are reviewed and their advantages and anticipated challenges for evaluating grid code compliance are highlighted. Experiences gained over the past decade from testing wind turbines and constructing experimental testing facilities are shared, including key data and capabilities of the developed test benches. The authors expect the presented approach to be used for validating simulation models that can be embedded into larger interaction and stability studies of wind farms at a later stage. Such an integrated testing approach may lead to quicker and more flexible design and optimization of new generations of wind turbines, effectively increasing the speed of grid integration and ensuring safe and reliable grid operation.","PeriodicalId":93182,"journal":{"name":"IEEE open journal of power electronics","volume":null,"pages":null},"PeriodicalIF":5.0000,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10432956","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE open journal of power electronics","FirstCategoryId":"1085","ListUrlMain":"https://ieeexplore.ieee.org/document/10432956/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

To safely integrate large numbers of wind turbines into the electric power grid, turbines must demonstrate compliance with grid codes and technical guidelines through rigorous testing. Such tests are traditionally performed using prototype turbines on designated measurement sites. So-called field tests offer little flexibility and repeatability, as factors such as wind and grid conditions cannot be adjusted at will. Recently, specialized laboratory test facilities were established to augment or completely replace conventional field tests. These facilities need to constantly grow in size, power, and functionality to keep up with wind turbine trends, while new and increasingly complex grid requirements necessitate more advanced testing methodologies. This paper presents four testing concepts and how they can be further integrated into the development and certification process of wind turbines using the laboratories of Fraunhofer IWES as an example. In particular, turbine, nacelle, subsystem, and component testing are reviewed and their advantages and anticipated challenges for evaluating grid code compliance are highlighted. Experiences gained over the past decade from testing wind turbines and constructing experimental testing facilities are shared, including key data and capabilities of the developed test benches. The authors expect the presented approach to be used for validating simulation models that can be embedded into larger interaction and stability studies of wind farms at a later stage. Such an integrated testing approach may lead to quicker and more flexible design and optimization of new generations of wind turbines, effectively increasing the speed of grid integration and ensuring safe and reliable grid operation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
兆瓦级风力涡轮机先进测试方法的机遇与挑战
为了安全地将大量风力涡轮机并入电网,涡轮机必须通过严格的测试证明符合电网规范和技术准则。传统上,此类测试是在指定的测量地点使用原型风机进行的。所谓的现场测试几乎没有灵活性和可重复性,因为风力和电网条件等因素无法随意调整。最近,人们建立了专门的实验室测试设施,以加强或完全取代传统的现场测试。这些设施的规模、功率和功能需要不断扩大,以跟上风力涡轮机的发展趋势,而新的、日益复杂的电网要求也需要更先进的测试方法。本文以弗劳恩霍夫 IWES 实验室为例,介绍了四种测试概念,以及如何将其进一步整合到风机的开发和认证过程中。本文特别回顾了涡轮机、机舱、子系统和组件测试,并强调了它们在评估电网规范合规性方面的优势和预期挑战。此外,还分享了过去十年中在风机测试和实验测试设施建设方面的经验,包括已开发测试台的关键数据和功能。作者希望所介绍的方法可用于验证仿真模型,这些模型可在稍后阶段嵌入更大规模的风电场相互作用和稳定性研究中。这种综合测试方法可以更快、更灵活地设计和优化新一代风力涡轮机,有效提高并网速度,确保电网安全可靠运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
8.60
自引率
0.00%
发文量
0
审稿时长
8 weeks
期刊最新文献
Low Frequency versus High Frequency PWM in Medium Voltage, High Power, Higher Level Inverters: THD, Harmonic Filtering, and Efficiency Comparison Reliability Enhancement of Isolated Full-Bridge DC-DC Power Converter for Fast Charging of Electric Vehicles Constant-Parameter Average-Value Model of Power-Electronic Voltage-Source Converters With Direct Interface in Electromagnetic Transient Simulators A Novel Reduced-Order Modeling Approach of a Grid-Tied Hybrid Photovoltaic–Wind Turbine–Battery Energy Storage System for Dynamic Stability Analysis Ultra-High Gain Quadratic DC-DC Topology Using Two-winding Coupled Inductors with Voltage Multiplier Cells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1