Decision trees in cost–benefit analysis for flood risk management plans

J. Napolitano, Massimo Di Francesco, G. Sechi
{"title":"Decision trees in cost–benefit analysis for flood risk management plans","authors":"J. Napolitano, Massimo Di Francesco, G. Sechi","doi":"10.2166/hydro.2024.194","DOIUrl":null,"url":null,"abstract":"\n According to the European Directive 2007/60/CE, flood risk evaluation should include a cost–benefit analysis (CBA) on a long-term time horizon to evaluate the impact of mitigation measures. The standard CBA assumes to know in advance the events observed in the time horizon and a priori compares all mitigation measures by an economic metric. No change is supposed to be made to these measures throughout the time horizon. This modus operandi is not appropriate in the domain of flood risk management because several conditions are uncertain when the CBA is made (e.g., urban policies). This article faces these challenges by the integration of cost–benefit analysis and decision trees, to prescribe mitigation measures under uncertainty on the budget for mitigation actions because their funding can be modified after the conclusion of the CBA. The former integration is discussed in the real case of the lowland valley of the Coghinas River (Sardinia, Italy), for which the classical CBA compared five mitigation measures of infrastructural works. The integration into the decision tree also allows to evaluating mitigation measures with changes in infrastructural works and a lamination action. The outcomes advise to decreasing the maximum storage level and increase the peak lamination.","PeriodicalId":507813,"journal":{"name":"Journal of Hydroinformatics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Hydroinformatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/hydro.2024.194","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

According to the European Directive 2007/60/CE, flood risk evaluation should include a cost–benefit analysis (CBA) on a long-term time horizon to evaluate the impact of mitigation measures. The standard CBA assumes to know in advance the events observed in the time horizon and a priori compares all mitigation measures by an economic metric. No change is supposed to be made to these measures throughout the time horizon. This modus operandi is not appropriate in the domain of flood risk management because several conditions are uncertain when the CBA is made (e.g., urban policies). This article faces these challenges by the integration of cost–benefit analysis and decision trees, to prescribe mitigation measures under uncertainty on the budget for mitigation actions because their funding can be modified after the conclusion of the CBA. The former integration is discussed in the real case of the lowland valley of the Coghinas River (Sardinia, Italy), for which the classical CBA compared five mitigation measures of infrastructural works. The integration into the decision tree also allows to evaluating mitigation measures with changes in infrastructural works and a lamination action. The outcomes advise to decreasing the maximum storage level and increase the peak lamination.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
洪水风险管理计划成本效益分析中的决策树
根据第 2007/60/CE 号欧洲指令,洪水风险评估应包括长期成本效益分析 (CBA),以评估减灾措施的影响。标准的成本效益分析假定预先知道在时间范围内观察到的事件,并预先用经济指标对所有减灾措施进行比较。在整个时间范围内,这些措施不应该有任何变化。这种工作方式不适合洪水风险管理领域,因为在进行成本效益分析时,有几种情况是不确定的(如城市政策)。本文通过成本效益分析与决策树的结合来应对这些挑战,在减灾行动预算不确定的情况下规定减灾措施,因为其资金在成本效益分析结束后可能会被修改。前者的整合在 Coghinas 河(意大利撒丁岛)低地河谷的实际案例中进行了讨论,经典的成本效益分析比较了基础设施工程的五项减缓措施。通过与决策树的结合,还可以对改变基础设施工程和层压行动的减缓措施进行评估。结果表明,应降低最大蓄水量并增加峰值层压。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Predicting total upland sediment yield using regression and machine learning models for improved land management and water conservation An integrated cyberinfrastructure system for water quality resources in the Upper Mississippi River Basin A novel application of waveform matching algorithm for improving monthly runoff forecasting using wavelet–ML models Sensitivity of creep parameters to pressure fluctuation of transient flow in viscoelastic pipes Impacts of emergent rigid vegetation patches on flow characteristics of open channels
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1